My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RJM DESIGN GROUP INC. 2 - 2014
Clerk
>
Contracts / Agreements
>
R
>
RJM DESIGN GROUP INC. 2 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2020 11:50:27 AM
Creation date
12/30/2014 4:00:58 PM
Metadata
Fields
Template:
Contracts
Company Name
RJM DESIGN GROUP INC.
Contract #
A-2014-223
Agency
PUBLIC WORKS
Council Approval Date
9/16/2014
Expiration Date
9/30/2015
Insurance Exp Date
9/30/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Record Drawings /As -built Plans: <br />Upon construction completion, consultant shall incorporate as -built information, as provided by the General <br />Contractor, into the drawing files to provide record drawings for City archives. <br />Technical Specifications <br />Technical specifications for all components listed above shall be provided by Consultant, or their Sub - consultants, <br />to the City in CSI (Construction Specifications Institute) format. City Staff will combine these specifications with the <br />City Boiler Plate which together, will become the Project Manual, <br />Final Opinion of Probable Cost <br />Consultant shall provide updated opinion of probable construction cost which shall reflect finalized plans, <br />materials, systems, details of construction, and known or anticipated changes in the bidding market relative to the <br />project. <br />Bidding <br />Consultant shall provide support to the City during the Bidding phase by assisting with questions, requests for <br />information /clarification, or conflicts arising out of the bidding process. Consultant shall also attend pre -bid <br />meeting, if scheduled. <br />FEE PROPOSAL: <br />Fee proposal shall be structured as follows: <br />Task 1: <br />Pre - Design <br />Task 2: <br />Design Development <br />Task 3: <br />Construction Documents <br />Task 4: <br />Bidding <br />Total Fee <br />City of Santa Ana RFP IZ636 <br />Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.