My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PAULUS ENGINEERING, INC. 3 - 2014
Clerk
>
Contracts / Agreements
>
P
>
PAULUS ENGINEERING, INC. 3 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 12:05:33 PM
Creation date
1/5/2015 1:56:22 PM
Metadata
Fields
Template:
Contracts
Company Name
PAULUS ENGINEERING, INC.
Contract #
A-2014-229
Agency
PUBLIC WORKS
Council Approval Date
9/16/2014
Expiration Date
9/16/2017
Insurance Exp Date
5/1/2017
Destruction Year
2022
Document Relationships
PAULUS ENGINEERING, INC.
(Amended By)
Path:
\Contracts / Agreements\P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. The repair and construction of water mains (various materials including concrete cylinder and CML&C <br />steel) ranging from 4" to 30" in diameter and related appurtenances. <br />a. The repair and construction of system valves <br />b. The repair and construction of pressure reducing valves <br />c. The repair and construction of fire hydrants <br />d. Dewatering of excavations <br />e. Traffic Control <br />f. Disinfection and flushing <br />g. Site remediation and cleaning <br />3. The repair and construction of water and sewer pump stations and related appurtenances which may <br />include mechanical, electrical and piping components. <br />III. SUBCONTRACTORS <br />The use of Subcontractors is allowed but will require approval by City prior to start of any assigned <br />work. When a Subcontractor performs all or any part of the work, a markup shall be applied to the <br />Subcontractor's actual cost of such work. The Contractor may add a markup of 10 percent on the first <br />$5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in <br />excess of $5,000 of the subcontracted portion of the work. <br />RFP #14-044 — On -Call Emergency Sewer and Water System Repair Services <br />Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.