My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PAULUS ENGINEERING, INC. 3 - 2014
Clerk
>
Contracts / Agreements
>
P
>
PAULUS ENGINEERING, INC. 3 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 12:05:33 PM
Creation date
1/5/2015 1:56:22 PM
Metadata
Fields
Template:
Contracts
Company Name
PAULUS ENGINEERING, INC.
Contract #
A-2014-229
Agency
PUBLIC WORKS
Council Approval Date
9/16/2014
Expiration Date
9/16/2017
Insurance Exp Date
5/1/2017
Destruction Year
2022
Document Relationships
PAULUS ENGINEERING, INC.
(Amended By)
Path:
\Contracts / Agreements\P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paulus Engmi e r ng, Inc, <br />Control 8ng'10ming CbnCWorod Construction maotngctnout <br />12aeasa Aiumbor 724114 <br />Water <br />We have rope [red everything from 1 and 7water services, AC, PVC, ductile iron, cast <br />Iron, steel and GMLC water lines ranging from 41' up to 54" diameter pipe and cut <br />various sized new valves on an emergency basis, <br />The City of Anaheim had a 36" CMLC water line break Int a Palma Ave in Frontof the <br />Raiser Hospital on a Saturday afternoon, Upori receiving; the call we had a ctew and <br />equipment onsite within an hour and a half. The initial crew worked onsite until 5.'00 am <br />Sunday morning when our second crew came on and finished backfilling and paving the <br />street so It would be open for Monday morning rush hour.. <br />Irvine Ranch Water District had an Bn AC wafter line blowout in "fort Karmen Ave, which <br />gashed out the slope of the 405 overpass. We received the call at 9:00 pm and had a <br />M <br />a slope, as well its p� <br />rams and IRWO to ge <br />rice to the public. <br />ve back Von Karmen Ave,' <br />the project dome in a hotel <br />county had a severe <br />m that caused an <br />Canyon to help get them <br />eking with it about 600 If of <br />pair the water line and <br />ass out of the canyon. <br />able to make a road for <br />ng an 18 year relationship with Wells Supply, which is located In 8, <br />es un access to water pearls 24 hours a clay; We .have that same % <br />th our subcontractors and other material suppliers that allow us to s <br />ne for assistance on a project:. This includes welders, saw outters,' <br />ing, sand, rock, dewatering and rental companies. <br />28711F. CriRONADO ST., APtAx RIM, Citi. 92906 <br />TEL (714) 6132.3975 FAX V 14) 652.5V7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.