Laserfiche WebLink
Letter 15 <br />Jose Diaz <br />1 502 W. 9 "' Street <br />Santa Ana, CA 92703 <br />Response 15 -1 <br />The EA/DEIR analyzed the environmental impacts based on conceptual engineering. Design <br />refinements may occur as the project's engineering plans are finalized. The evaluation of changes <br />to the proposed project would be conducted in compliance with FTA implementing guidelines for <br />NEPA (23 CFR 771.129) and CEQA Guidelines (PRC Section 15162). Project changes that would <br />not result in new significant or adverse impacts as compared to what has been evaluated and <br />disclosed in this FEIR would be evaluated and documented in an Addendum to the FEIR and <br />possibly an Environmental Technical Memorandum as a supplement to the EA in compliance with <br />FTA and NEPA requirements. Project changes that would potentially result in new or adverse <br />significant impacts as compared to what has been evaluated and disclosed in this FOR would be <br />evaluated and documented in a supplemental or subsequent environmental document. A <br />supplemental or subsequent document would be subject to the same noticing requirements as the <br />EA /DEIR and public outreach would be conducted to allow community input and participation. For <br />project updates, visit the proposed project webpage at http : / /santaanatransitvision.com or <br />contact Jason Gabriel with the City of Santa Ana Public Works Department at 20 Civic Center <br />Plaza, M -93 P.O. Box 1988 Santa Ana, CA 92702. <br />Santa Ana Garden Grove Fixed Guideway Project REAIFEIR P a g el 172 <br />January 2015 <br />75A -230 <br />