My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - RESO SA-GG FIXED GUIDEWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
01/20/2015
>
75A - PH - RESO SA-GG FIXED GUIDEWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2015 4:19:43 PM
Creation date
1/15/2015 4:05:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75A
Date
1/20/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Letter 15 <br />Jose Diaz <br />1 502 W. 9 "' Street <br />Santa Ana, CA 92703 <br />Response 15 -1 <br />The EA/DEIR analyzed the environmental impacts based on conceptual engineering. Design <br />refinements may occur as the project's engineering plans are finalized. The evaluation of changes <br />to the proposed project would be conducted in compliance with FTA implementing guidelines for <br />NEPA (23 CFR 771.129) and CEQA Guidelines (PRC Section 15162). Project changes that would <br />not result in new significant or adverse impacts as compared to what has been evaluated and <br />disclosed in this FEIR would be evaluated and documented in an Addendum to the FEIR and <br />possibly an Environmental Technical Memorandum as a supplement to the EA in compliance with <br />FTA and NEPA requirements. Project changes that would potentially result in new or adverse <br />significant impacts as compared to what has been evaluated and disclosed in this FOR would be <br />evaluated and documented in a supplemental or subsequent environmental document. A <br />supplemental or subsequent document would be subject to the same noticing requirements as the <br />EA /DEIR and public outreach would be conducted to allow community input and participation. For <br />project updates, visit the proposed project webpage at http : / /santaanatransitvision.com or <br />contact Jason Gabriel with the City of Santa Ana Public Works Department at 20 Civic Center <br />Plaza, M -93 P.O. Box 1988 Santa Ana, CA 92702. <br />Santa Ana Garden Grove Fixed Guideway Project REAIFEIR P a g el 172 <br />January 2015 <br />75A -230 <br />
The URL can be used to link to this page
Your browser does not support the video tag.