My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - OCWD ASSESSMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
01/20/2015
>
25I - AGMT - OCWD ASSESSMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2015 4:39:07 PM
Creation date
1/15/2015 4:33:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25I
Date
1/20/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />Well No. 32 Nitrate Mitigation and Rehabilitation Study <br />3.4 Preliminary Cost Estimates <br />Project cost estimates were prepared for the project alternatives which include capital costs, operation and <br />maintenance, and unit costs. The project cost estimating was performed using the Association for the <br />Advancement of Cost Engineering (AACE) International's cost estimating classification system, which <br />defines five separate classes of cost estimates. For a study or feasibility level report, this is considered a <br />Class 4 estimate, and allows for an accuracy range of -15% to -30% on the low side, and +20% to +50% <br />on the high side. <br />3.4.1 Capital Costs <br />Construction costs consist of site work, mechanical equipment, filters, pumps, chemical metering <br />equipment, piping, valves, structural, electrical and instrumentation. Bonds and insurance have been <br />included at 2% and contractor's overhead and profit is assumed to be 10 %. A 30% construction cost <br />contingency is included for this planning level stage. The total capital cost includes a 20% cost allotment <br />for preparing engineering plans, specifications, bid and construction management and inspection, <br />technical, incidental permits, survey, geotechnical, legal, and administrative costs. <br />The capital cost for the blending option at Garthe Reservoir (Blending Only) is estimated at $4,650,000. <br />The capital cost for the blending option at Garthe Reservoir (Fill Reservoir) is estimated at $4,580,000. <br />The capital cost for the blending option at Memory Lane Pressure Reducing Facility is estimated at <br />$4,700,000. <br />The capital cost for the nitrate treatment facilities is estimated at $11,700,000. <br />It should be noted that the costs for the well rehabilitation as described in Section 4 have been included in <br />the capital cost estimate for each alternative. <br />Estimates of probable construction costs are contained in Appendix C <br />3.4.2 Operation and Maintenance Costs <br />Annual Operation and Maintenance Costs (O &M) were prepared and include power, chemicals, labor, <br />and maintenance materials for the treatment facilities. The annual O &M costs for the blending options <br />were not developed because the City currently incurs these costs already and would not be new. <br />A cost for off -site IX resin regeneration by a contracting service is also included in the annual costs. The <br />annual estimated O &M cost is $8.02 million and is contained in Appendix C. <br />P:T0059700g6\Engineering \05 \_ Wel1-32- N4ate- Miti,nti�raft RVoiIW2textdocx 14 TETRA TECH <br />251 -32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.