Laserfiche WebLink
Alternative 1 - Mixing <br />Mixing at John Garthe Reservoir <br />(Blending Only) <br />Capital Costs <br />Item <br />4uantity <br />Lipit i Dr ttriptiorf <br />Unit <br />Cast , <br />Total <br />Cbst <br />1 LS Well 32 Rehabilitation $500,000 $500,000 <br />Well 32 Reconstruction (Raise Well out of Vault and Construct $1,600,000 <br />1 LS Building) $1,600,000 <br />1 LS Construct 12" PVC Pipeline To Garthe Reservoir $1,000,000 $1,000,000 <br />Subtotal: $3,100,000 <br />Engineering, Legal, Administrative @ 20% <br />Contingency @ 30% <br />$620,000 <br />$930,000 <br />Total Capital Coss <br />CITY OF SANTA ANA <br />251 -64 <br />TETRA TECH, INC. <br />