Laserfiche WebLink
Alternative 4~Treatment <br />Off-Site Regeneration <br />Capital and Operating Costs <br />1 LS Treatment Plant (Qff-Site Generation) $E,700000 $5,700000 <br />1 LS Well 3%Rehabilitation $500,000 $500.000 <br />Well 32 Reconstruction (Raise Well out vf Vault and Cnnstrvcl <br />1 LS Building) $1,600,000 $1'800,000 <br />Subtotal: $7,800,000 <br />Engineering, Legal, Administrative @200% $1,560,000 <br />Contingency @ 30% $2340,000 <br />TvtwAnnva|()poraUn8Cnot(T,oatmontP|ant) 8,600,000 <br />CITY OF SANTA ANA <br />��U�� <br />��U���K <br />TETRA TECH, INC. <br />m6r� <br />Quantity] <br />Unit <br />cost <br />1 LS Treatment Plant (Qff-Site Generation) $E,700000 $5,700000 <br />1 LS Well 3%Rehabilitation $500,000 $500.000 <br />Well 32 Reconstruction (Raise Well out vf Vault and Cnnstrvcl <br />1 LS Building) $1,600,000 $1'800,000 <br />Subtotal: $7,800,000 <br />Engineering, Legal, Administrative @200% $1,560,000 <br />Contingency @ 30% $2340,000 <br />TvtwAnnva|()poraUn8Cnot(T,oatmontP|ant) 8,600,000 <br />CITY OF SANTA ANA <br />��U�� <br />��U���K <br />TETRA TECH, INC. <br />