My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-004 - Santa Ana-Garden Grove Fixed Guideway Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2015
>
2015-004 - Santa Ana-Garden Grove Fixed Guideway Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2015 5:01:28 PM
Creation date
1/27/2015 4:41:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda
Doc #
2015-004
Date
1/20/2015
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana — Garden Grove Fixed Guideway Project <br />Findings and Facts in Support of Findings and Statement of Overriding Considerations <br />The assessment shall be prepared by a Registered Environmental Assessor. The <br />assessment shall be prepared in accordance with State standards /guidelines to evaluate <br />whether the site or the surrounding area is contaminated with hazardous substances <br />from the potential past and current uses including storage, transport, generation, and <br />disposal of toxic and hazardous waste or materials. If hazardous materials are identified <br />in the Phase I Environmental Site Assessment, a Phase II Environmental Site <br />Assessment would be completed to identify the extent of contamination and the <br />procedures for remediation. The Phase II Environmental Site Assessment shall be <br />approved by the California Department of Toxic Substances Control. <br />C. Noise (Project Operation) (page 3 -152 of the EA/DEIR) <br />Potential Impact: Project - related noise levels would exceed the significance thresholds at five <br />Noise Sensitive Areas (NSA). Therefore, without mitigation, a significant impact related to <br />operational noise levels would occur. <br />Finding: Changes or alterations have been required in, or incorporated into, the proposed <br />project which would mitigate or avoid the significant effects on the environment as identified in <br />the REA/FEIR. <br />Facts in Support of Finding: Significant noise impacts at sensitive receptors NSA -4 <br />(Spurgeon Intermediate School), NSA -6 (seven housing units), NSA -7 (five housing units), and <br />NSA -8 (two housing units) would result from sounding of a warning horn and audible warning <br />devices at gate crossings. Significant noise impact at NSA -9 (five housing units) would result <br />from operation of the O & M Facility. Mitigation Measure N1 would reduce noise impacts <br />associated with warning horns, Mitigation Measure N2 would reduce noise impacts associated <br />with streetcar pass -by noise, and Mitigation Measure N3 would reduce noise impacts at NSA -9 <br />by 5 dBA and NSA -10 by 4 dBA. Implementation of Mitigation Measures N1 through N3 would <br />reduce impacts related to operational noise to less than significant. <br />Mitiaation Measure <br />N1 The City of Santa Ana shall request a horn - sounding exemption from the California <br />Public Utilities Commission for the crossing at 5th and Fairview Streets. The exemption <br />shall provide justification and demonstrate that safety would not be compromised. In lieu <br />of the warning horn, supplemental safety measures (e.g., four -quad gates, roadway <br />median barriers on grade crossing approaches, and pedestrian gates) would be <br />implemented. If a horn sounding exemption is approved and established, warning horns <br />would not be sounded except under an emergency situation. <br />20 January 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.