My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-004 - Santa Ana-Garden Grove Fixed Guideway Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2015
>
2015-004 - Santa Ana-Garden Grove Fixed Guideway Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2015 5:01:28 PM
Creation date
1/27/2015 4:41:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda
Doc #
2015-004
Date
1/20/2015
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana — Garden Grove Fixed Guideway Project <br />Findings and Facts in Support of Findings and Statement of Overriding Considerations <br />• Roadway improvements including the Bristol Street Widening project, which will widen <br />Bristol Street from four to six lanes between Warner Avenue and Memory Lane, and the <br />Grand Avenue Widening project, which will widen Grand Avenue from four to six lanes <br />between 1 st Street and 17th Street. <br />Findings for No Build Alternative <br />The City of Santa Ana finds that specific economic, legal, social, technological, or other <br />considerations, including considerations for the provision of employment opportunities for highly <br />trained workers, make infeasible the No Build Alternative identified in the EA/DEIR and <br />REA/FEIR (CEQA Guidelines 15091(a)(3)). Although the No Build Alternative would not result <br />in environmental impacts, it would not provide the desired levels of mobility and accessibility <br />within the City of Santa Ana. In addition, the No Build Alternative would not foster economic <br />development opportunities, promote sustainable transportation investments to respond to the <br />needs of the community, or deliver travel, benefits, reliability, and choice to the public <br />transportation system. Therefore, the No Build Alternative would not be consistent with the <br />goals and objectives of the proposed project. <br />TSM Alternative <br />The TSM Alternative enhances the mobility of existing transportation facilities and transit <br />network without construction of major new transportation facilities or significant, costly physical <br />capacity improvements. The TSM Alternative emphasizes low cost (i.e., small physical) <br />improvements and operational efficiencies, such as focused traffic engineering actions, <br />expanded bus service, and improved access to transit services. Included within the TSM <br />Alternative are modifications and enhancements to selected bus routes in the Study Area <br />including: <br />• Skip -stop overlay service on 1st Street (Route 64) which includes access to SARTC; <br />• A new route between SARTC and Harbor Boulevard/Westminster Avenue via Civic Center <br />Drive, Bristol Street and 17th StreetNVestminster Avenue, providing 10- minute peak and 20- <br />minute off -peak service; <br />• Expanded service span for StationLink service (Route 462) between SARTC and the Civic <br />Center, providing 15- minute service during both peak and off -peak hours; <br />• In addition, the following system operational improvements are included in the TSM <br />Alternative: <br />• Traffic signal timing improvements at select congested locations along Santa Ana Boulevard <br />and Civic Center Drive to provide for enhanced east -west bus flow, potential including but <br />not limited to: <br />• Main Street at Civic Center Drive <br />• Broadway at Civic Center Drive <br />• Flower Street at Civic Center Drive <br />• Fairview Street at Civic Center Drive <br />• Santa Ana Boulevard at Santiago Street <br />31 January 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.