Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 11-6416 <br />SEVENTEENTH STREET WATER MAIN IMPROVEMENTS <br />Item <br />Bid Item <br />Unit <br />Qty <br />Base Bid <br />Base Bid <br />Alternate# <br />Alternate#1 <br />Night <br />Night <br />1Unit Price <br />Day Work <br />Work Unit <br />Work <br />Day Work <br />Amount <br />Price <br />Amount <br />New Fire Hydrant <br />y, <br />("f <br />7. <br />Assembly, Including <br />EA <br />17 <br />$ <br />$&/ —01 <br />$' 3ao'® <br />$ <br />Gate Valve and Lateral <br />Pipe <br />8. <br />1" Air Vacuum and <br />$ c <br />$ "osv <br />$ Do0 <br />Release Valve <br />EA <br />4 <br />9 <br />Vertical Offset per City <br />$ & PCA" <br />$ <br />$ � <br />$ ag, boe <br />Std. Plan 1413B <br />EA <br />4�� <br />10. <br />8" Resilient Wedge Gate <br />$� <br />Valve <br />EA <br />12 <br />11 <br />12" Resilient Wedge <br />$ 4 y, <br />$ 3 <br />$ Mao <br />$ c c ®po <br />Gate Valve <br />EA <br />11 <br />Bore and Jack, Install <br />12. <br />Steel Casing and PVC <br />EA <br />4 <br />00 <br />Carrier Pipe <br />13. <br />Traffic Loop Detector <br />EA <br />45 <br />$ ?7S y <br />$�5- <br />$ _.�o® <br />SOa -0 <br />14. <br />Signing and Striping <br />LS <br />1 <br />$ <br />$ LJ�� f" <br /><� <br />$aaov �' <br />$ 4Aq `J <br />15. <br />Traffic Control and <br />LS <br />1 <br />Traffic Control PlanTOTAL <br />BID <br />�S93,SYc7.Do <br />/,G73,GyD.o® <br />The lowest responsible bidder shall be selected based on the BASE BID Amount. The City <br />reserves the right to award the Base Bid, and any, all or none of the alternate Bid Items. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete said work within one hundred and twentv <br />five (125) working days after the commencement date stated in the Notice to Proceed. The <br />bidder also proposes to commence construction of the Work within thirty (30) calendar days <br />after issuance of a Notice To Proceed, and to continue in a diligent and workman -like manner <br />without interruption, and to complete the construction thereof within the time specified above. <br />P -lb <br />Sedmn 3 - a Proposal 09-22-2014 <br />