My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AMIRAN CONSTRUCTION-2014
Clerk
>
Contracts / Agreements
>
A
>
AMIRAN CONSTRUCTION-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2015 1:58:38 PM
Creation date
2/11/2015 11:14:04 AM
Metadata
Fields
Template:
Contracts
Company Name
AMIRAN CONSTRUCTION
Contract #
A-2014-303
Agency
PUBLIC WORKS
Council Approval Date
12/2/2014
Expiration Date
5/15/2015
Insurance Exp Date
1/9/2016
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. During the last five years, has there been more than one occasion in which the General contractor or its <br />associates have been penalized or required to pay back wages for failure to comply with the federal <br />Davis -Bacon prevailing wage requirements? ❑ Yes ❑■ No <br />If "yes," on a separate page, describe the violator, nature of each violation, name of the project, date of <br />its completion, the public agency for which it was constructed, the number of employees who were <br />initially underpaid and the amount of back wages and penalties that were assessed. <br />THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. <br />PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. <br />RFP FOR LED POST TOP RETROFIT STREETLIGHTS & SARTC STRUCTURE LIGHTING Page 1 21 �~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.