Laserfiche WebLink
EXHIBIT A <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS FOR LED POST TOP RETROFIT STREETLIGHTS <br />SCOPE OF SERVICES <br />DESCRIPTION AND SCOPE OF WORK <br />The City of Santa Ana is issuing this Request for Proposals (RFP) LED Retrofit Downtown Streetlights <br />& SARTC Parking Structure Lighting. This RFP calls for: removal and disposal of existing luminaires; <br />furnishing and installing new LED luminaires; all testing, including photometric and energy <br />consumption, to prove that furnished luminaires perform as specified. ALL FIXTURES MUST BE DLC <br />APPROVED. <br />The City desires to install two (2) types of post top LED retrofit fixtures. The fixtures must be designed <br />to fit in existing historical streetlight poles and /or globes. There is an option to provide globes; the <br />globes shall be: Formed Plastics FP118 -9PCC w/ FP 110 finial or approved equal. <br />1. For "double king" historic streetlight poles. Proposed fixture shall be down light style: Powerlux <br />PLEDPT /40001840112- 240 /MP /H2 /F1 or approved equal. <br />2. For single pole fixture shall be: Lighting by Design LBD /66 /31UV3 /MOG /NL or approved equal. <br />3. For surface mount parking structure lights the fixture shall be: Simply LED CLG- 60 -C -AP or <br />approved equal. <br />4. For shoe box style the fixture shall be: Deco Digital D816- LED- 80- 50- UNV -PM -BZ or approved <br />equal. <br />Approved Equal: Fixture submittals for approved equal must be submitted one week prior to due date <br />of proposals with actual fixture samples due on proposal due date. <br />ALTERNATE PROPOSAL calls for providing fixtures only with no installation. All testing, including <br />photometric and energy consumption, to prove that furnished luminaires perform as specified shall be <br />included in the "provide only" cost. <br />IMPLEMENTATION <br />1. City staff shall have the right to modify, reduce, or delete the services as needed by City. <br />2. The term of the contract shall be for one (1) year which shall commence on the date that <br />City Council approves the award or the date that all required bonds and insurance have <br />been approved by the City Attorney, whichever occurs last. <br />A. LIQUIDATED DAMAGES <br />If the City determines that the contractor breaches its promise to provide services in compliance <br />with the Terms and Conditions of applicable laws and regulations, and the specifications set <br />forth above, it would be impracticable and extremely difficult to determine the damage to City <br />arising from such breach. Therefore, in the event of contractor's breach, contractor shall pay to <br />City the sum of $500 per day for such breach, in addition to any cost, fines, etc. levied against <br />the City. <br />RFP FOR LED POST TOP RETROFIT STREETLIGHTS & SARTC STRUCTURE LIGHTING Page 110 <br />