My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POWERLUX CORPORATION 2 -2014
Clerk
>
Contracts / Agreements
>
P
>
POWERLUX CORPORATION 2 -2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 10:05:31 AM
Creation date
2/11/2015 2:36:38 PM
Metadata
Fields
Template:
Contracts
Company Name
POWERLUX CORPORATION
Contract #
A-2014-301
Agency
PUBLIC WORKS
Council Approval Date
12/2/2014
Expiration Date
5/15/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
XVILFAILURE TO PERFORM SATISFACTORILY <br />A. It is agreed and understood that in the short run, if the Contractor fails to perform the work as <br />specified herein, the Director, 1) will pay only for the amount of service received as determined by the <br />Director with an appropriate downward adjustment in contract price, or 2) may have such required work <br />done by City forces or otherwise, and charge the cost thereof to the Contractor. <br />Such adjustments will be the estimated cost for performance by City forces plus City overhead and will <br />include overtime pay as required to complete work. <br />B. If the Contractor performs the work in such a manner that the amount of payment withheld due <br />to substandard performance, nonperformance and forfeiture for noncompletion per schedule totals five <br />(5) percent of the total contract price, the City will put the Contractor under notice of noncompliance. If <br />the Contractor continues to perform the work in such a manner that the amount of payment withheld <br />due to substandard performance, nonperformance and forfeiture for noncompletion per schedule totals <br />ten (10) percent of the total contract price, the contract is subject to cancellation at the City's option. In <br />the event of cancellation for unsatisfactory performance, the original Contractor shall reimburse the City <br />for damage accrued by changing contractors. <br />XVIII.SAFETY REQUIREMENTS <br />All work performed under this contract shall be performed in a manner as to provide required maximum <br />safety to the public and where applicable, comply with all safety standards required by CAL -OSHA. <br />The Director reserves the right to issue restraint or cease and desist orders to the Contractor when <br />unsafe or harmful acts are observed or reported relative to the performance of the work under this <br />contract. <br />XIX.HAZARDOUS CONDITIONS <br />The Contractor shall maintain all work sites free of hazards to persons and/or property resulting from its <br />operations. Any hazardous condition noted by the Contractor, which is not a result of its operations, <br />shall be immediately reported to the Public Works Agency. <br />XX.UTILITIES <br />Any damage to utility lines that occurs shall immediately report to the utility company that is involved. <br />The cost of repair, if required, will be at the Contractor's expense. If damage occurs to any adjacent <br />shrubs or trees that are to remain on the site, immediate treatment or necessary replacements of the <br />same shall be at the Contractor's expense. <br />XXI.ACCESS TO PRIVATE PROPERTY <br />Prior to any work that will restrict access to private property the Contractor shall notify each affected <br />property owner or responsible person, informing him of the nature of and the approximate duration of <br />the restriction. <br />XXILPROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS <br />The Contractor shall be responsible for the protection of all improvements adjacent to the work, such as <br />sprinkler systems, drain pipes, lawns, brick work, plantings, masonry work, fences, wall, sidewalks, <br />street paving, etc., located on either public or private property. If any improvements are damaged they <br />shall be replaced in kind at the Contractor's expense. <br />RFP FOR LED POST TOP RETROFIT STREETLIGHTS & SARTC STRUCTURE LIGHTING Page 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.