My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RESO 2015-02_150112_1206NHarbor
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2015
>
RESO 2015-02_150112_1206NHarbor
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 2:45:59 PM
Creation date
2/23/2015 2:45:46 PM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Item #
15-02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by the adoption of a Statement of Overriding Considerations <br />by the City Council. Any other negative or adverse impacts <br />will be mitigated through mitigation measures identified in <br />Environmental Impact Report No. 2014 -01 and conditions of <br />approval for the vesting map. <br />6. The design or improvements of the proposed project will not conflict <br />with the easements acquired by the public at large for access <br />through or use of property within the proposed project. <br />The design or improvements of the proposed project will not <br />conflict with easements necessary for public access through <br />or use of the property within the proposed project since there <br />is no public access easement located within this property. <br />E. In accordance with the California Environmental Quality Act (CEQA), the <br />recommended action has been determined to be adequately evaluated in <br />the previously certified EIR No. 2014 -01 as per Sections 15162 and 15168 <br />of the CEQA guidelines. All mitigation measures in EIR No. 2014 -01 and <br />associated Mitigation Monitoring and Reporting Program (MMRP) have <br />been enforced and continue to apply to the proposed project. As required <br />by the MMPR, a traffic impact analysis was performed to analyze any <br />potential changes in area traffic as a result of the proposed development. <br />The study concluded that no additional significant impacts that would <br />trigger the requirement for additional environmental review. <br />F. The applicant agrees to indemnify, hold harmless, and defend the City of <br />Santa Ana, its officials, officers, agents, and employees, from any and all <br />liability, claims, actions or proceedings that may be brought arising out of <br />its approval of this project, and any approvals associated with the project, <br />including, without limitation, any environmental review or approval, except <br />to the extent caused by the negligence of the City of Santa Ana. <br />Section 2. The Planning Commission of the City of Santa Ana after conducting <br />the public hearing hereby approves Vesting Tentative Tract Map No. 2014 -01 as <br />conditioned in Exhibit A attached hereto and incorporated as though fully set forth <br />herein. This decision is based upon the evidence submitted at the abovesaid hearing, <br />which includes but is not limited to: the Request for Planning Commission Action dated <br />January 12, 2015 and exhibits attached thereto; and the public testimony, all of which <br />are incorporated herein by this reference. <br />Resolution No. 2015 -02 <br />Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.