My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA - ACTIVE TRANS GRANT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
03/03/2015
>
20A - AA - ACTIVE TRANS GRANT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2015 3:06:51 PM
Creation date
2/26/2015 3:06:10 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
3/3/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Active Transportation Program Grants <br />I <br />Bike Lanes <br />Newhope -Civic Center -Grand Class II Bike <br />$272,000 <br />Lanes <br />2 <br />Complete Street Plan <br />5th Street (from Harbor Blvd. to Sullivan <br />$300,000 <br />Street), Raitt Street (from 1 stet Street to <br />McFadden Avenue), St. Andrew Place (from <br />Bristol Street to Main Street), Bishop Street <br />(from Broadway to Standard Avenue) and <br />Orange Street from 1 st St to Warner Ave) <br />3 <br />SRTS Enhancement <br />Curb extensions, upgrading wheelchair ramps <br />$480,000 <br />for Heninger Elem <br />and educational outreach and traffic signal at <br />Flower /Walnut <br />4 <br />SRTS Enhancement <br />Curb extensions, upgrading wheelchair ramps <br />$500,000 <br />for King Elem <br />and educational outreach and traffic signal at <br />McFadden/Pacific <br />5 <br />SRTS Enhancement <br />Curb extensions, upgrading wheelchair ramps <br />$780,000 <br />for Washington Elem <br />and educational outreach and traffic signal at <br />Flower /Anahurst and left turn arrows at <br />Flower/Warner <br />6 <br />Bishop - Pacific- <br />Develop, Design and Construct bike boulevards <br />$950,000 <br />Shelton Bike <br />Boulevards <br />7 <br />SRTS Enhancement <br />Curb extensions, upgrading wheelchair ramps <br />$430,000 <br />for Monte Vista Elem <br />and educational outreach and left turn arrows at <br />McFadden/Raitt <br />8 <br />Maple Bike Trail <br />Enhance Bike Trail Crossings <br />$1,101,000 <br />Safety Enhancements <br />$4,813,000 <br />Exhibit 1 <br />20A -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.