Laserfiche WebLink
Active Transportation Program Grants <br />I <br />Bike Lanes <br />Newhope -Civic Center -Grand Class II Bike <br />$272,000 <br />Lanes <br />2 <br />Complete Street Plan <br />5th Street (from Harbor Blvd. to Sullivan <br />$300,000 <br />Street), Raitt Street (from 1 stet Street to <br />McFadden Avenue), St. Andrew Place (from <br />Bristol Street to Main Street), Bishop Street <br />(from Broadway to Standard Avenue) and <br />Orange Street from 1 st St to Warner Ave) <br />3 <br />SRTS Enhancement <br />Curb extensions, upgrading wheelchair ramps <br />$480,000 <br />for Heninger Elem <br />and educational outreach and traffic signal at <br />Flower /Walnut <br />4 <br />SRTS Enhancement <br />Curb extensions, upgrading wheelchair ramps <br />$500,000 <br />for King Elem <br />and educational outreach and traffic signal at <br />McFadden/Pacific <br />5 <br />SRTS Enhancement <br />Curb extensions, upgrading wheelchair ramps <br />$780,000 <br />for Washington Elem <br />and educational outreach and traffic signal at <br />Flower /Anahurst and left turn arrows at <br />Flower/Warner <br />6 <br />Bishop - Pacific- <br />Develop, Design and Construct bike boulevards <br />$950,000 <br />Shelton Bike <br />Boulevards <br />7 <br />SRTS Enhancement <br />Curb extensions, upgrading wheelchair ramps <br />$430,000 <br />for Monte Vista Elem <br />and educational outreach and left turn arrows at <br />McFadden/Raitt <br />8 <br />Maple Bike Trail <br />Enhance Bike Trail Crossings <br />$1,101,000 <br />Safety Enhancements <br />$4,813,000 <br />Exhibit 1 <br />20A -5 <br />