My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - RFP - STREET TREE MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
03/17/2015
>
19E - RFP - STREET TREE MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2015 3:01:05 PM
Creation date
3/12/2015 2:22:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19E
Date
3/17/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. <br />discretion in determining conformance and acceptability of trees trimmed by the <br />Contractor. Trimmed trees rejected by the City's representative shall be <br />excluded from payment. <br />(2) Contractor shall comply with Standards of the Division of Occupational Safety <br />and Health (CAL OSHA) and the American National Standard Institute (ANSI), <br />Z133.1 -1988, Safety Requirements. <br />(3) These specifications are intended to cover all labor, material and standards of <br />architectural, landscaping, and mechanical workmanship to be employed in the <br />work called for in these specifications or reasonably implied by terms of same. <br />Work or materials of a minor nature which may not be specifically mentioned, but <br />which may be reasonably assumed as necessary for the completion of this work, <br />shall be performed by the Contractor as if described in the specifications. <br />All correspondence shall be addressed to: <br />Danell Mercado — Projects Manager <br />Public Works Agency— Maintenance Division <br />220 South Daisy Avenue — Building A <br />Santa Ana, CA 92703 <br />dmercado ansanta- ana.ora <br />K. PROVISIONS FOR EXTRAS <br />(1) No new work of any kind shall be considered an extra unless a separate estimate <br />is given for said work and the estimate is approved in writing by the City before <br />the work is commenced. The Contractor will be required to provide before and <br />after photographs of safety items or emergency repairs which were made without <br />prior City approval. Documentation of contract compliance may be required on <br />some occasions. <br />(2) Should a change or extra work be found necessary by the City, all changes and <br />extra work shall be performed at the same unit price of any proposal item listed. <br />If the work is not listed as a proposal item, the Contractor shall submit a fair cost <br />for the work to be performed. A change order authorization, in writing, will be <br />issued by the City. <br />(3) The City reserves the right to increase or decrease the quantity of any item(s) or <br />portion(s) of the work described in the specifications or the proposal form or to <br />omit portions of the work so described as may be deemed necessary or <br />expedient by the City Arborist or designated representative and the Contractor <br />shall agree not to claim or bring suit for damages, whether for loss of profits or <br />otherwise, on account of any decrease or omission of any kind of work to be <br />done. The City shall reduce the price accordingly. Alterations, modifications or <br />deviations from the work described in the scope of services by Contractor shall <br />be subject to the prior written approval of the City. Any price adjustments shall be <br />made by mutual consent of the parties in that case. <br />City of Santa Ana Street Tree Maintenance RFP <br />19E -20 Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.