My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - RFP - STREET TREE MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
03/17/2015
>
19E - RFP - STREET TREE MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2015 3:01:05 PM
Creation date
3/12/2015 2:22:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19E
Date
3/17/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(6) The Contractor shall submit a lineal foot cost for the root pruning and root barrier <br />installation. The cost of providing all labor, tools, equipment and materials <br />necessary for performing the specified work will be included in the Proposal price <br />and no additional compensation will be allowed. <br />CONSULTANT ARBORIST <br />The contractor will provide the service of a consultant arborist. When requested , the consultant <br />arborist will be performing tree health assessment which should include 360 degree, ground -based <br />visual inspections of the tree crown, trunk, trunk flare, above ground roots and branch and stem <br />defects, drilling evaluation of target risk increment, boring, probing, , sounding, sub - surface root and <br />soil assessment and site conditions around the tree in relation to targets. <br />City of Santa Ana Street Tree Maintenance RFP <br />19E -39 Page 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.