My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - TRAFFIC SIGNAL AND BIKE LANES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
03/17/2015
>
23A - PROJ - TRAFFIC SIGNAL AND BIKE LANES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2015 3:57:39 PM
Creation date
3/12/2015 3:56:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
3/17/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />CITY OF SANTA ANA <br />PROPOSAL PROJEGr No. 12 -6761, 14 -6814, 14.6818 <br />PROJECT NO. 12.6761: Traffic Signal Rapt St &Adams St ADDENDUM No, TWO <br />PROJECT NO. 14-6814: Class ll Bike Lane on First St Februwy 2,2015 <br />PROJECT NO. 14-68M Class I I Bike Lane on Newhape St <br />70: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: California Professional Engineering, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the <br />proposed work, that they have examined the Contract Documents in its entirety and hereby <br />proposes to furnish all material and do all the work required to complete the said work in <br />accordance with said plans (If any) and the specifications for the unit price(s) or lump sum(s) set <br />forth in the following schedule: <br />Prolect# 12.6761 <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Traffic Signal Installation on Raltt St & <br />1 <br />LS <br />$ <br />$ <br />AdamsSt <br />14 0 -1 <br />2 <br />GJT Emergency Vehicle Preemption System <br />1 <br />LS <br />$ <br />$ <br />Per Plan <br />3 <br />Install 2" PVC Conduit per plan <br />25 <br />LF <br />$ <br />$ <br />a- <br />► aso� <br />4 <br />Install 3" PVC Conduit per plan <br />725 <br />LF <br />$^ p <br />off- p <br />$^� <br />c�-� -� i goo- <br />5 <br />Install 4" PVC Conduit per plan <br />280 <br />LF <br />$ <br />$qq� <br />�S Y <br />I Uts✓ ^ I <br />6 <br />No. 6 Pull Box <br />11 <br />EA <br />$ <br />7 <br />Type "E" Loop <br />22 <br />EA <br />$ <br />$ <br />9-�L0 <br />OW <br />8 <br />Type "D" Bike Loop <br />10 <br />EA <br />$a <br />$ <br />�^� <br />9 <br />Striping per Traffic Signal Plan <br />1 <br />LS <br />$ <br />1 3aca- <br />$ <br />Iv�c <br />to <br />Install lP Communication Equipment <br />1 <br />LS <br />$ <br />_ —,._- <br />_(ENCOM_Hadto_Sy- Stem) <br />11 <br />CCTV System Complete <br />1 <br />LS <br />$ <br />$ <br />P -1 <br />23A -30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.