My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA, STATE OF, OFFICE OF TRAFFIC SAFETY (4) - 2014
Clerk
>
Contracts / Agreements
>
C
>
CALIFORNIA, STATE OF
>
CALIFORNIA, STATE OF, OFFICE OF TRAFFIC SAFETY (4) - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2015 4:36:45 PM
Creation date
3/24/2015 1:59:30 PM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA, STATE OF, OFFICE OF TRAFFIC SAFETY
Contract #
A-2014-283
Agency
PUBLIC WORKS
Council Approval Date
11/18/2014
Expiration Date
9/30/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE A <br />GRANT DESCRIPTION <br />GRANTNo. PS1506 <br />PAGE 4 <br />a) If an OTS template -based press release is used, the OTS PIO and Coordinator should be copied <br />when the release is distributed to the press. If an OTS template is not used, or is substantially <br />changed, a draft press release should first be sent to the OTS PIO for approval. Optimum lead <br />time would be 10 -20 days prior to the release date to ensure adequate turn- around time. <br />b) Press releases reporting the results of grant activities such as enforcement operations are exempt <br />from the recommended advance approval process, but still should be copied to the OTS PIO and <br />Coordinator when the release is distributed to the press. <br />c) Activities such as warrant or probation sweeps and court stings that could be compromised by <br />advanced publicity are exempt from pre - publicity, but are encouraged to offer embargoed media <br />coverage and to report the results. <br />• Use the following standard language in all press, media, and printed materials; Funding for this <br />program was provided by a grant from the California Office of Traffic Safety, through the National <br />Highway Traffic Safety Administration. <br />• Email the OTS PIO at pio06ots.ca.gov and copy your OTS Coordinator at least 30 days in advance, a <br />short description of any significant grant - related traffic safety event or program so OTS has sufficient <br />notice to arrange for attendance and/or participation in the event. <br />• Submit a draft or rough -cut of all printed or recorded material (brochures, posters, scripts, artwork, <br />trailer graphics, etc.) to the OTS PIO at piogibots.ca.gov and copy your OTS Coordinator for approval <br />14 days prior to the production or duplication. <br />• Include the OTS logo, space permitting, on grant- funded print materials; consult your OTS <br />Coordinator for specifics. <br />C. Phase 3 —Data Collection & Renortina (Throughout Grant Year) <br />• Agencies are required to collect and report quarterly, appropriate data that supports the progress of <br />goals and objectives. <br />• Statistical data relating to the grant goals and objectives will be collected, analyzed, and incorporated <br />in Quarterly Performance Reports (QPRs). QPRs for the quarter ending September 30 will include <br />year -to -date comparisons of goals and objectives. If required, a separate quarterly data reporting <br />form will be completed each quarter and submitted as part of the QPR. <br />• Reports wilt compare actual grant accomplishments with the planned accomplishments. They will <br />include information concerning changes made by the Grant Director in planning and guiding the <br />grant efforts. <br />OTS -38b (Rev. 5114) <br />
The URL can be used to link to this page
Your browser does not support the video tag.