My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA, STATE OF, WATER RESOURCES CONTROL BOARD - 2014
Clerk
>
Contracts / Agreements
>
C
>
CALIFORNIA, STATE OF
>
CALIFORNIA, STATE OF, WATER RESOURCES CONTROL BOARD - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 3:26:44 PM
Creation date
3/25/2015 5:30:09 PM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA, STATE OF, WATER RESOURCES CONTROL BOARD
Contract #
A-2014-305
Agency
PUBLIC WORKS
Council Approval Date
12/2/2014
Expiration Date
9/30/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />State Water Board Grant Agreement No. 14-449-550 <br />Amendment 1 <br />Page 5 of 21 <br />B. PROJECT -SPECIFIC REQUIREMENTS <br />1. Project Management <br />1.1 Provide all technical and administrative services as needed for Agreement completion; monitor, <br />supervise, and review all work performed; and coordinate budgeting and scheduling to ensure the <br />agreement is completed within budget, on schedule, and in accordance with approved procedures, <br />applicable laws, and regulations. <br />1.2 Notify the Grant Manager at least fifteen (15) working days in advance of upcoming meetings, <br />workshops, and trainings. <br />1.3 Conduct pre-, during, and post -construction photo monitoring and submit to the Grant Manager. <br />1.4 Conduct periodic and final site visits with the Grant Manager. <br />2. Planning, Design, and Engineering <br />2.1 Prepare a topographic survey of the site, a permeability testing and structural pavement design, <br />and landscape renderings and submit to the Grant Manager in an electronic format. <br />2.2 Complete the preliminary engineered design plans and specifications for the installation of a <br />minimum of eleven thousand (11,000) square feet of porous pavement and a minimum of three <br />thousand (3,000) square feet of a bioretention system. Submit the preliminary engineered design <br />plans and specifications to the Grant Manager in an electronic format for review and approval. <br />2.3 Complete the final engineered design plans and specifications and prepare a summary identifying <br />changes from the preliminary plans in Item 2.2. Submit the final plans and summary of changes to <br />the Grant Manager for review and approval.prior to preparing bid documents in Item 2.4. <br />2.4 Complete the bid documents and advertise the Project for bid. Submit the awarded bid documents <br />to the Grant Manager in an electronic format. <br />3. Construction and Implementation <br />3.1 Award the construction contract and submit the Notice to Proceed to the Grant Manager in an <br />electronic format. <br />3.2 Construct the Project in accordance with the approved engineered design plans and specifications. <br />3.3 Submit as -built drawings to the Grant Manager in an electronic format. <br />3.4 Prepare and submit an Operations and Maintenance Plan to the Grant Manager for review and <br />approval. <br />4. Monitoring and Performance <br />4.1 Monitor in accordance with the approved MP. <br />4.2 Analyze monitoring results, document implementation of monitoring in accordance with the <br />approved MP, and include a summary report of the monitoring results in the associated quarterly <br />progress report. A summary of all monitoring and data analysis shall be included in the Final <br />Project Report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.