My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/07/2015
>
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2015 3:32:45 PM
Creation date
4/2/2015 4:21:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75C
Date
4/7/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
918
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ma <br />ORANGE COUNTY TRANSIT DISTRICT <br />Dear Mr. Alvarez: <br />SUBJECT: NOP EIR /EIS BRISTOL STREET WIDENING <br />We have reviewed this project as described in the NOP and have the fol- <br />lowing comments: <br />a OCTD presently offers service along the entire project length, as <br />indicated on the attached route maps and schedules, with a number <br />of bus stops within the project area, as shown on Table 1. <br />• As shown on Table I, OCTD has a number of on- street stops lo- <br />cated in the vicinity of several intersections along the project <br />length. It appears that the aid -black cross sections would be <br />sufficient to accommodate on- street stops, but our concern is <br />that this travel lane may narrow as it approaches an <br />intersection. If this is the rase, turnouts may need to be <br />provided in order to insure smooth traffic flow through these <br />areas. <br />• In order to minimize construction related disruption and delays <br />to the District's fixed route service, the maximum number of <br />lanes should remain open during the widening project. In addi- <br />tion, we would appreciate coordination of the construction <br />period with our Bus Operations staff. Please contact the fol- <br />lowing staff person during final design and prior to beginning <br />construction, to coordinate access to bus stops and bus vehicle <br />movements through the project area during construction: <br />Mr. Mannie Thomas <br />Supervisor, Communications and Operations <br />Orange County Transit District <br />P.O. Sox 3005 <br />Garden Grove, CA 92642 <br />(714) 530 -5910 <br />11222 ACACIA PARKWAY • P O, SOX MAM29F)VE. CALIFQRNIA 92642 • 171 41 971 -6200 _ <br />IVY �.fO <br />� <br />� A <br />July 23, 1987 <br />N <br />O M <br />Mr. George Alvarez <br />o <br />City of Santa Ana, Public Services Agency <br />P,O. Box 1988 M -21 <br />a <br />Santa Ana, CA 92702 <br />Dear Mr. Alvarez: <br />SUBJECT: NOP EIR /EIS BRISTOL STREET WIDENING <br />We have reviewed this project as described in the NOP and have the fol- <br />lowing comments: <br />a OCTD presently offers service along the entire project length, as <br />indicated on the attached route maps and schedules, with a number <br />of bus stops within the project area, as shown on Table 1. <br />• As shown on Table I, OCTD has a number of on- street stops lo- <br />cated in the vicinity of several intersections along the project <br />length. It appears that the aid -black cross sections would be <br />sufficient to accommodate on- street stops, but our concern is <br />that this travel lane may narrow as it approaches an <br />intersection. If this is the rase, turnouts may need to be <br />provided in order to insure smooth traffic flow through these <br />areas. <br />• In order to minimize construction related disruption and delays <br />to the District's fixed route service, the maximum number of <br />lanes should remain open during the widening project. In addi- <br />tion, we would appreciate coordination of the construction <br />period with our Bus Operations staff. Please contact the fol- <br />lowing staff person during final design and prior to beginning <br />construction, to coordinate access to bus stops and bus vehicle <br />movements through the project area during construction: <br />Mr. Mannie Thomas <br />Supervisor, Communications and Operations <br />Orange County Transit District <br />P.O. Sox 3005 <br />Garden Grove, CA 92642 <br />(714) 530 -5910 <br />11222 ACACIA PARKWAY • P O, SOX MAM29F)VE. CALIFQRNIA 92642 • 171 41 971 -6200 _ <br />IVY �.fO <br />
The URL can be used to link to this page
Your browser does not support the video tag.