My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/07/2015
>
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2015 3:32:45 PM
Creation date
4/2/2015 4:21:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75C
Date
4/7/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
918
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bristol Street is a north -south arterial road through the City of Santa Ana that <br />connects to the Garden Grove Freeway and the San Diego Freeway. Bristol <br />Street is generally believed to as a supplementary north -south access <br />through Santa Ana for peak hour motorists who choose to avoid the heavily <br />traveled Newport Freeway (State Highway 55) which parallels Bristol Street <br />one to three miles to the east. <br />Two major traffic generators significantly affect traffic volumes on Bristol <br />Street. Rancho Santiago Community College is located at the southwest <br />corner of Bristol Street and 17th Street within the project area. The South _. <br />Coast Plaza Regional Shopping Center is located approximately two miles <br />south of Warner Avenue at the junction of Bristol Street and the San Diego <br />Freeway (Interstate 405). Other significant traffic contributors include Santa <br />Ana's scattered industrial areas as well as the city, county, and federal <br />government facilities and corporate and financial offices in the Downtown core .� <br />to the east of Bristol Street. <br />Future traffic volumes, for the target year 2006, were developed using <br />historical and projected traffic, and development and population data obtained <br />from the City of Santa Ana. Comparison of past and present traffic volumes <br />along Bristol Street revealed the growth in traffic to be approximately one (1) <br />percent per year. In the Five -Year Trau=ortation Study Update to 1990 <br />prepared by Basmaciyan- Darnell, Inc., June 1985, the projected increase in _ <br />area -wide traffic volumes south of the project area was anticipated to be <br />greater than one (1) percent per year. The volume of traffic on Bristol Street <br />north of Warner Avenue is, however, consistent with a one (1) percent per _ <br />year growth rate. <br />It was assumed that in the year 2006 all roads would be built out to their <br />ultimate widths, as designated on the Orange Coua General Plan - Master <br />Plan of Arterial Highways Component, County of Orange, Environmental <br />Management Agency, 1982. <br />Future Without Widening <br />Evaluation of the operating conditions Bristol Street would experience under <br />future year 2006 traffic volumes was based upon the same methodology as was <br />described under the Section B above. Table 3 summarizes the project traffic <br />volumes on each link with the corresponding levels of service for "no build" <br />and 'build" conditions. -- <br />Under the "no- project" alternative, each link of Bristol Street from Memory <br />Lane to Warner Avenue would experience a Level of Service of "F". Traffic - <br />on Bristol Street would be extremely congested and motorists would <br />experience a great deal of delay. <br />I -14 <br />75C -37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.