My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/07/2015
>
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2015 3:32:45 PM
Creation date
4/2/2015 4:21:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75C
Date
4/7/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
918
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />r <br />DKS Associates <br />Table of Contents <br />EXECUTIVE SUMMARY <br />1. INTRODUCTION ............... ............................... <br />1 <br />2. PROJECT DESCRIPTION .......... ............................... <br />2 <br />21 Bristol Street Widening Project ............................... <br />2 <br />2.2 Bristol Street Specific Plan ... ............................... <br />4 <br />3. EXIS'T'ING CONDITIONS .......... ............................... <br />6 <br />3.1 Major Street Characteristics .. ............................... <br />6 <br />3.2 Midblock Capacity Analysis .. ............................... <br />10 <br />3.3 Intersection Capacity Analysis . ............................... <br />10 <br />3.4 Bus Transit ............................................ <br />16 <br />4. GENERAL PLAN CONDITION (YEAR 2006) WITH AND WITHOUT <br />WIDENING .................. ............................... I8 <br />5. SPECIFIC PLAN IMPACT ......... ............................... <br />23 <br />5.1 Trip Generation .......... ............................... <br />23 <br />5.2 Trip Distribution and Assignment ............................. <br />23 <br />5.3 Midblock Operation ...................... . ...... <br />. ........ 28 <br />5.4 Intersection Operational Analysis ....................... <br />. ..... 28 <br />6. RESIDENTIAL IMPACT ........... ............................... <br />7. GUIDELINES FOR DESIGN STANDARDS ............................ <br />8. MITIGATION MEASURES ......... ............................... <br />8.1 Proposed Bus Turnout Locations ............................ . <br />8.2 Signal Installation ........ ............................... . <br />APPENDIX <br />Figures <br />32 <br />35 <br />40 <br />40 <br />41 <br />Figure 3 -1 <br />Vicinity Map ................... . <br />Figure 3 -2 <br />Existing Lane Configuration .. ............................... <br />13 <br />Figure 4 -1 <br />Future Lane Configuration (General Plan, Year 2006) ............... <br />22 <br />Figure 5 -1 <br />Traffic Analysis Zones ...... ............................... <br />24 <br />Figure 6 -1 <br />Peak Hour Warrant Future With Specific Plan .................... <br />34 <br />Figure 7 -1 <br />75C -518 <br />
The URL can be used to link to this page
Your browser does not support the video tag.