My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/07/2015
>
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2015 3:32:45 PM
Creation date
4/2/2015 4:21:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75C
Date
4/7/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
918
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DKS Associates <br />3. Existing Conditions <br />3.1 MAJOR STREET CHARACTERISTICS <br />Bristol Street <br />Bristol Street serves as the main arterial in the study area. Although numerous smaller, local <br />roadways currently intersect Bristol Street within the study area, several larger primary and <br />secondary arterial roadways intersect Bristol Street providing primary access from the easterly <br />and westerly directions. These roadways are Warner Avenue, Edinger Avenue, McFadden <br />Avenue, 1st Street and 17th Street. The vicinity map of the project site is shown in Figure 3 -1. <br />Bristol Street is designated as a major arterial highway (120 -foot right-of-way) in the Orange <br />County Master Plan of Streets and Highways and is a designated truck route through the City <br />of Santa Ana. Bristol Street has an existing right -of -way varying from 70 to 115 feet, while <br />curb -to -curb width varies from 58 to 89 feet. The area adjoining Bristol Street varies in existing <br />land use with a mixture of both commercial and residential developments. <br />The number of through travel lanes varies from four to six, excluding left -turn lanes at major <br />intersections and right -turn lanes at Bristol Street's intersection with Warner Avenue, McFadden <br />Avenue, 1st Street, 17th Street and Memory Lane. Bristol Street varies from a four -lane <br />undivided road to a five -lane undivided road between Memory Lane and Warner Avenue. <br />Bristol Street has an estimated average daily traffic that varies from 50,500 vehicles south of <br />Memory Lane to 33,200 vehicles south of McFadden Avenue. <br />Warner Avenue <br />Warner Avenue is designated as a major arterial highway in the Orange County Master Plan. <br />East of Bristol Street, Warner Avenue has a roadway width of 70 feet and is striped for four <br />through lanes and a two -way left -turn lane. West of Bristol Street, Warner Avenue is 90 feet <br />wide with three eastbound lanes, two westbound lanes and a raised center median. The <br />eastbound curb lane on Warner Avenue becomes a right -turn lane at Bristol Street. The <br />average daily traffic volumes on Warner Avenue are estimated to be 28,500 vehicles east of <br />Bristol Street and 27,600 vehicles west of Bristol Street. Warner Avenue has a posted speed <br />limit of 35 MPH. <br />Edinger Avenue <br />lw Edinger Avenue is designated as a primary arterial highway on the Orange County General Plan- <br />West of Bristol Street, Edinger Avenue has a roadway width of 74 feet and is striped for two <br />zaeszrvozzJbratra 6 <br />i <br />75C -538 <br />
The URL can be used to link to this page
Your browser does not support the video tag.