My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/07/2015
>
75C - PH - BRISTOL EIR FROM WARNER TO ST. ANDREW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2015 3:32:45 PM
Creation date
4/2/2015 4:21:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75C
Date
4/7/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
918
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DKS Associates <br />The directional orientation of trips to and from the study area was based on overall peak hour <br />area wide circulation patterns and the project location in relationship to regional service and <br />employment concentrations. <br />About 29% of the total traffic is distributed northbound toward the SR -22 and 1 -5 and another <br />29% is distributed southbound toward SR -55 and SR -405. The easterly and westerly portions <br />were assigned 21% each. <br />Trips to and from the project study area were assigned to logical access routes based upon the <br />trip distribution percentages discussed above. <br />5.3 MIDBLOCK OPERATION <br />The estimated future daily operational analysis summary for the existing, future without Specific <br />Plan and future with Specific Plan is shown in Table 54. There are no significant changes in <br />levels of service along Bristol Street in the study area with Specific Plan in comparison to <br />without the Specific Plan. <br />5.4 INTERSECTION OPERATIONAL ANALYSIS <br />The intersection operational analyses were done for peak hour conditions. The PM peak hour <br />represents the worst case situation, although the level of service does not differ drastically from <br />AM peak hour conditions. This might be due to a good balance in land use that exists between <br />residential and commercial development. The impacts on the intersections along Bristol Street <br />due to the Specific Plan in comparison with the existing, future without Specific Plan, and future <br />with Specific Plan are shown on Table 5 -5 and Table 5-6- <br />For the 13 study intersections, there will be no significant changes in quality of traffic operation <br />on any of the intersections in comparison with the future condition without Specific Plan. All <br />intersections are found to he functioning at a satisfactory level of service. <br />28557P9022kO Rpt 28 <br />75C -562 <br />
The URL can be used to link to this page
Your browser does not support the video tag.