My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - BRISTOL EIR FR CIVIC CENTER TO WASHINGTON(no exhibit 1)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/07/2015
>
75B - PH - BRISTOL EIR FR CIVIC CENTER TO WASHINGTON(no exhibit 1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2015 12:32:24 PM
Creation date
4/3/2015 10:54:31 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75B
Date
4/7/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase IIIA— Civic Center Drive to Washington Avenue <br />1.4.3 Changes as Compared to the Approved Project <br />It should be noted that Project phasing has been revised from the original three phases identified in the <br />1990 FEIS /EIR. Construction phasing of the entire Project segment has been further subdivided as <br />follows: <br />• St. Andrew Place to McFadden Avenue (Constructed in 2002) <br />• Elm Street to Memory Lane (Constructed in 2003) <br />• Pine Street to 3rd Street (Constructed in 2009) <br />• Phase I: McFadden Avenue to Pine Street (Constructed in 2011)' <br />• Phase II: 3rd Street to Civic Center Drive (Constructed in 2014) <br />• Phase IIIA: Civic Center Drive to Washington Avenue <br />• Phase IIIB: Washington Avenue to 17d' Street <br />• Phase IV: Warner Avenue to St. Andrew Place <br />• Phase V: 17"' Street to Elm Street <br />The proposed street widening design configuration for the current Phase IIIA segment (proposed Project <br />addressed herein) differs from the original configuration of the 1990 FEIS /EIR, as follows: <br />• The 1990 FEIS /EIR, using decommissioned noise methodology, recommended noise barriers <br />(soundwalls) at all easterly parcel boundaries currently fronting the east side of Bristol Street <br />between Civic Center Drive and Washington Avenue. However, using current noise modeling <br />methodology (RBF Consulting 2014), noise abatement in the form of noise barriers is not <br />required for the Phase IIIA Project. <br />• For purposes of aesthetic treatment and enhancement, the proposed Project would install an <br />approximately 8 -foot high block wall at approximately the same location where soundwalls were <br />previously recommended (as addressed in the 1990 FEIS /EIR). <br />• The proposed Project increases the total right -of -way width from 120 feet to 128 feet. The <br />proposed Project right -of -way cross - section would maintain a curb -to -curb width of 100 feet, <br />would accommodate a 7 -foot wide bike lane on each side of the roadway, and would not affect <br />the number or width of vehicular travel lanes as compared to the right -of -way cross - section <br />addressed in the 1990 FEIS /EIR. However, the proposed Project right -of -way cross section, as <br />compared to the right -of -way cross section addressed in the 1990 FEIS /EIR, would reduce the <br />width of the sidewalks from 10 to 8 feet and also accommodate a 6 -foot wide parkway on each <br />side of Bristol Street to separate pedestrian and vehicular travel; a parkway was not included as <br />part of the roadway cross section addressed in the 1990 FEIS /EIR. Acquisition of property <br />resulting from the proposed Project right -of -way is accounted for in this analysis. <br />• Addition of a westbound right -turn lane on Washington Avenue at Bristol Street. <br />• Removal of eastbound through movement on Washington Avenue at Bristol Street to match <br />existing condition. <br />• Addition of a cul -de -sac at 9th Street on the west side of Bristol Street. <br />• Full and partial acquisition on both sides of Bristol Street between Civic Center Drive and <br />Washington Avenue. <br />• Changes in land use as part of the Bristol Specific Plan Addendum, as follows: <br />'- Phase numbers were assigned to the Bristol Street Widening Project subsequent to cancelation of the ConterLine Light Rail <br />Transit Project and associated reallocation of funding from that canceled project to the Bristol Street Widening Project <br />ANA 305-011 (PER 02) CITY OF SANTA ANA (01/19/2015) YU <br />75B -33 <br />PAGE 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.