My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2015-04-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/07/2015
>
FULL PACKET_2015-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2015 11:31:54 AM
Creation date
4/3/2015 10:59:15 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/7/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Bike Lane Project Development <br />Planning 4 — Projects = $510,0000 <br />• Citywide Speed Limit Study <br />• Complete Streets Plans <br />• Traffic Management Plans <br />• Traffic Safety Project Development <br />Streetcar <br />• Continue partnership with OCTA <br />• Design Oversight <br />Mobility /Safety 6 — Projects = $7,393,580 <br />• Heninger Elementary SRTS <br />• King Elementary SRTS <br />• Monte Vista Elementary SRTS <br />• South Main Corridor Improvements <br />• Washington Elementary SRTS <br />• Westminster Ave /17th ST Corridor Signal Synch <br />Sewer Main Improvements 5 — Projects $5,132,600 <br />• Citywide Sewer Main Improvements <br />• Columbine Sewer Main Improvements <br />• Parton, Garnsey, Van Ness, 15th Streets Sewer Main <br />• Sewer Main Repairs & Replacements <br />• Warner Industrial Park Sewer Main Improvements <br />Water Main Improvements 7 — Projects = $16,143,430 <br />• Bristol Phase 3B Water <br />• Neighborhood Water Main Projects <br />• Centennial <br />• Riverview <br />• West Grove Valley <br />• S. Bristol Water Main Improvements <br />• Warner Industrial Park Water Main Improvements <br />Facility Improvements 5 — Projects = $12,063,000 <br />• SA -5 MWD Turnout Vault Relocation <br />• Segerstrom (San Lorenzo) Sewer Lift <br />• S. Station Perimeter Wall <br />• Well No. 32 Rehabilitation <br />Technology 1 — Project = $3,278,200 <br />• SA -5 MWD Turnout Vault Relocation <br />• Segerstrom (San Lorenzo) Sewer Lift <br />• S. Station Perimeter Wall <br />• Well No. 32 Rehabilitation <br />Improvements <br />CITY COUNCIL MINUTES 104-22 MARCH 17, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.