My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-17 Regular
Clerk
>
Minutes
>
CITY COUNCIL
>
2010-2019
>
2015
>
2015-03-17 Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 1:49:27 PM
Creation date
4/13/2015 9:39:37 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Minutes
Agency
Clerk of the Council
Date
3/17/2015
Destruction Year
P
Notes
Item 25B - Rec. Action #2 - was authorization only - no applicants were selected at that time. Agmt. # issued in error.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Storm Drain/Water Quality 4 — Projects = $824,890 <br />• Drainage Master Plan Supplement <br />• First St. Undercrossing Lift Station <br />• Residential Catch Basin Connector Pipe Screen Installation <br />• Santa Ana Delhi Channel Diversion <br />Transit Facilities 2 — Projects = $958,519 <br />• Safe Transit Stops <br />• SARTC ADA Improvements <br />Recreation Improvements 9 — Projects = $3,091,584 <br />• Playground Equipment: <br />• Centennial Park <br />• Delhi <br />• Lillie King <br />• Madison <br />• Rosita <br />• Thornton <br />• Dan Young Soccer Complex — Turf <br />• Pacific Electric Park Improvements <br />• Santa Ana River/ Memory Lane Park <br />Park Facilities 8 — Projects = $2,098,919 <br />• Centennial Lake Circulation Study <br />• Morrison Park LID Improvements <br />• Sandpoint Paseo Security Lighting <br />• Santa Ana Stadium Structural Repairs <br />• Santiago Park Gas House Landscape <br />• Thornton Park Electrical / Restroom / Lighting <br />• Willits Sullivan Community Beautification <br />Zoo Facilities 2 — Projects = $2,125,000 <br />• Amazon's Edge Giant River Otter <br />• Master Plan <br />PMP Program = $200,000 <br />• Pavement Management Program <br />Pavement Management Program $250,000 <br />• Safe Mobility Santa Ana <br />• Address Transportation System Safety <br />Street Light LED Conversion = $8,600,000 <br />Warner Assessment District = $6,000,000 <br />CIP Outreach Plan <br />CITY COUNCIL MINUTES 23 MARCH 17, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.