My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
04/21/2015
>
25C - AGMT - ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2015 5:12:00 PM
Creation date
4/16/2015 5:07:29 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
4/21/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- I <br />a -- <br />Section 1: Key Technical <br />a, e <br />°cnaoa�aa <br />Information <br />AVO <br />_ <br />1 <br />NORTH <br />a. The network of Harbor Boulevard is <br />Garden <br />Grove <br />being proposed for traffic signal <br />i <br />synchronization. According to Figure 1, the <br />Waslniinsle�& <br />project limits are from Chapman Ave in the <br />City of Garden Grove to Newport Blvd in the <br />m <br />City of Costa Mesa, which will have inter- <br />. o <br />5i <br />Santa Ana <br />agency coordination among five jurisdictions. <br />0 <br />0 <br />0 <br />Ed,,v Asia ♦ter <br />b. Designation of the corridor to <br />�'OU!tialn0 <br />vAfoy <br />i <br />synchronize: <br />© <br />® Priority Corridor ❑ Signal <br />LEGEND <br />% e <br />j'' <br />�� Harbor Blvd Corridor <br />Synchronization Network Corridor <br />awlfj emoo? <br />t <br />❑Master Plan of Arterial Highways Corridor <br />9 0 <br />e <br />® City of Garden Grove <br />® Coltrane <br />® <br />{ <br />•city of Santa Ana <br />C. Project start date: May 1, 2015 <br />a'84 et1 ' <br />a City of Fountain valley <br />Project end date: May 1. 2018 <br />±= § <br />City of Costa Mesa <br />All agencies commit to operate signal <br />synchronization beyond the three year grant <br />m, <br />period for. <br />4 <br />90 years ❑l year ❑2 years <br />„ 1 <br />El years ❑Other <br />3 S <br />Figure l: Signalized intersection and <br />Proposed Project limits <br />d. Signalized intersections that are part of the project: see Table I <br />2 <br />25C -26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.