Laserfiche WebLink
Development Agreement No. 2015 -01 <br />Site Plan Review No. 2015 -02 <br />March 23, 2015 <br />Page 4 <br />Architecture — The architectural character of the building is contemporary and utilizes a "perimeter <br />block" typology where buildings generally face interior courtyard areas. The buildings will feature <br />multiple colors, stucco, cement board, aluminum storefront systems, metal railings, varied skyline <br />massing components and different parapet heights on all facades, with specific emphasis on <br />street - facing elevations. In addition, residential units will be grouped along building facades <br />between stairwells that establish smaller building clusters as part of the overall building design <br />(Exhibits 14 and 15). <br />Amenities — The project will contain both exterior and interior amenities. Exterior amenities include <br />a water wall feature at the intersection of Macarthur Place and Macarthur Boulevard, and <br />additional water elements at First American Way and Macarthur Place. The podium level will <br />contain additional amenities including a passive courtyard that complements an active pool court, <br />two rooftop garden decks, a community room and fitness center. Interior amenities within the <br />common areas Will include granite counter tops, hardwood flooring and gas fireplaces. <br />Residential units will feature granite (or equivalent) countertops, hardwood flooring, tiled bathroom <br />and shower stalls, stain grade cabinetry, appliances and washer -dryer units (Exhibits 16 through <br />19). <br />Open Space — The project will contain 72,830 square feet of open space, including 22,402 square <br />feet of private open space in the form of a private balcony or deck area space with an average of 256 <br />square feet of open space per unit. An additional 50,428 square feet of common open space will be <br />distributed within the overlook terrace at Level No. 1, raised podium pool deck on Level 2, and two <br />roof decks on Level 5. Moreover, each unit will contain private open space in the form of a deck or <br />patio, <br />Landscaping— The project proposes to provide a 30 -foot setback along MacArthur Boulevard <br />featuring a combination of landscape berms and decorative hardscape areas and 15 feet along <br />MacArthur Place and First American Way. The project interior also includes landscaping within the <br />courtyard areas. The 0.8 -acre portion of the development located at the northeast corner of the site <br />will be incorporated into the project development and will feature additional landscaping along the <br />project's shared point of access (Exhibit 20), <br />Protect Background <br />The proposed development site is part of the larger MacArthur Place District Center master plan, a <br />mixed use development plan that was approved by the City Council via a Specific Development (SD- <br />43) on January 4, 1988, In 2005, the Geneva Commons Development was approved on the subject <br />site to allow an eight -story and 18 -story tower with 278 residential condominium units. Although the <br />project was entitled, permits were never obtained for its construction due to changes in market <br />conditions. <br />75A -6 <br />