My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO AND AGMT - 800MHZ RADIO SYS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
05/05/2015
>
55A - RESO AND AGMT - 800MHZ RADIO SYS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2015 3:47:28 PM
Creation date
4/30/2015 3:35:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
55A
Date
5/5/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Training is not included. <br />4.121 Perform R56 Installation Audit <br />Motorola Responsibilities: <br />• Perform R56 site-installation gtullity audits, verifying prop er physic <br />alinstallationandoperntional <br />configurations. <br />• Create site evaluation report to verify site meets or exceeds requirements, as defined in <br />Motorola's Standards and Guidelines for Communication Sites (R56). <br />Customer Responsibilities: <br />• Provide access /escort to the sites. <br />• Witness tests. (if desired) <br />Completion Criteria: <br />All R56 audits completed successfully. <br />4. 12.2 Perform Equipment Testing <br />Motorola Responsibilities: <br />• Test individual components of the system to verify compliance to the equipment specifications. <br />• Repeat any failed test(s) once Motorola (or Santa Ana) has completed the corrective action(s). <br />• Prepare documentation of component tests to be delivered as part of the final documentation <br />package, <br />Customer Responsibilities: <br />• Witness tests if desired. <br />Completion Criteria: <br />Successful completion of equipment testing. <br />4.12.3 Perform Functional Testing <br />Motorola Responsibilities: <br />• Verify the operational functionality and features of the individual subsystems and the system <br />supplied by Motorola, is contracted. <br />• If any roajor task as contractually described fails, repeat that particular task after Motorola <br />determines that corrective action has been taken. <br />• Document all issues that arise during the acceptance tests, <br />• Document the results of the acceptance tests and present to Santa Ana for review. <br />• Resolve any minor task failures before final System Acceptance. <br />Customer Responsibilities: <br />Witness the functional testing. <br />City of Santa Ana <br />MCC7500 P25 olspatch Migration and Subscribers <br />02 April 2015 <br />Use or disclosure of this proposal Is subject <br />to the restrictions on the cover page. <br />Motorola Solutions CorOdential Restrlcted Statement of Werh 4.12 <br />55A -122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.