My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - STREET REPAIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
05/05/2015
>
23A - PROJ - STREET REPAIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2015 3:44:06 PM
Creation date
4/30/2015 3:41:12 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
5/5/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 14 -7516 AND 15 -7514 <br />RESIDENTIAL STREET REPAIR FY 13/14 & 14/15 <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Amount <br />13 <br />Construct FCC Curb only(B -1) <br />450 <br />LF <br />$) <br />14 <br />Grind FCC <br />50 <br />LF <br />$ <br />r <br />$ <br />15 <br />Adjust Manhole Frameand Coverto Grade <br />25 <br />EA <br />$ <br />$ <br />ra(9aJ7 <br />16 <br />Furnish and install Water Valve Frame and <br />Cover to Grade <br />15 <br />EA <br />$ <br />$ <br />17 <br />Signing and Striping <br />1 <br />LS <br />18 <br />Root Shave <br />30 <br />EA <br />$1 <br />� <br />$�1 <br />19 T <br />construction Signs <br />1q <br />EA <br />$ <br />$ 22�k0 <br />TOTAL BID <br />('T0. s <br />The lowest BIDDER shall be selected on based on the lowest responsible total bid. The City <br />reserves the right to award the Base Bid, and any, all, or none of the add - alternate bid items (if <br />any). <br />The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3 -2 of the Standard Specifications. The <br />actual amount for this item will be dictated by the actual quantity used, and the Agency <br />reserves the right to increase or decrease the quantity of this item accordingly. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within seventy 70 working days after the commencement date stated in the <br />Notice to Proceed, The bidder also proposes to commence construction of the Work within ten <br />10 days after issuance of a Notice to Proceed, and to continue in a diligent and workman -like <br />manner without interruption, and to complete the construction thereof within the time <br />specified above, <br />The liquidated damages amount in lieu of the amount specified in Subsection 6 -9 of the <br />Standard Specifications, shall be $3,400 per calendar day. <br />NUBIA <br />Name of Firm L ?0W VnAA0A — <br />Signature of BIDDER <br />Title C,P- 8R0YJt!, PA E SiP. ENT <br />(if an individual, so state) <br />BP -2 of 15 <br />23A -17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.