My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - STREET REPAIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
05/05/2015
>
23A - PROJ - STREET REPAIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2015 3:44:06 PM
Creation date
4/30/2015 3:41:12 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
5/5/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br />ITEVIQf S IO.,i3 (t;E113RENCLS• W3 <br />Contractor's Nwnc; Pal p Ino. DBA.Excel Naving.,Co <br />Projecp Nntne; Santa Monice;Transit Parkway Project <br />Project Description: Underground,,.Retaining Walls; FWy; on Ramps, <br />A/C Pave, Sidewalk, Curb &'Gutter, Signalization,. <br />Landscaping, Storm Drain Impvts, .Sewer, Water <br />And Retaining Wall <br />Location: F'r'om 405 f vey, To Beverly Hills City Limit, Los Angeles <br />Construction Value: <br />$34,455,152.00 <br />Date of Completion: <br />11/05 <br />General Contractor Information: <br />Palp Inc. DBA E#ce1 Paving Company <br />Contact: <br />Bruce rlatt <br />Phone: <br />562/599 -5841 <br />Fax: <br />562/5914485 <br />Ov✓tter Information: <br />City of Los Angeles <br />Contact: <br />Carl Nelson <br />Phone: <br />213/485 -4474 <br />Pax: <br />213/485 -4836 <br />23A -37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.