My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2015-05-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
05/05/2015
>
FULL PACKET_2015-05-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2015 11:00:42 AM
Creation date
4/30/2015 5:38:12 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/5/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Console schedule: <br />FYI 4115 - Loma Ridge, Irvine, Laguna Beach, Huntington Beach <br />FY15 /16 - Anaheim, Brea, West Comm, Santa Ana, Tustin <br />FYI 6/17 - Orange, Fullerton, Costa Mesa, Garden Grove, Westminster <br />FY17 /18 - Placentia, La Palma, Newport Beach, Fountain Valley, <br />Buena Park, La Habra <br />23 System Field Equipment — When the System Backbone is upgraded to the P25 <br />standard in FY 2018/2019, all subscriber radio equipment will also need to be P25 <br />capable. Subscriber radios that are capable of being upgraded will need to receive <br />the software /firmware upgrade prior to the backbone upgrade. Older subscriber <br />radio equipment that is not capable of being upgraded to the P25 standard will <br />need to be replaced prior to the P25 upgrade. Each agency will be responsible for <br />the purchase of either replacement radios, or the necessary subscriber upgrade <br />package for upgradable radios. <br />2.4 P25 Upgrade — When all backbone sites and law dispatch consoles have <br />completed their equipment replacement, the vendor will initiate the necessary <br />equipment and software update to bring the system up to the 7.18 software <br />platform for P25 compliance. This final phase of the System Extension plan is <br />scheduled for FY 2018/2019. <br />Page 9 of 11 <br />55A -16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.