Laserfiche WebLink
Agronomic Plan. QAL's /QAC's may oversee unlicensed Contractor staff backpack <br />applications of glyphosate. The Contractor shall respond to all City requests for <br />pesticide control of pests within 40 hours of written email notice by the City or the <br />Contractor shall be penalized up to $300 per day. <br />d) The Contractor shall provide an International Society of Arborist TRAQ Certified <br />Hazardous Tree Professional employee or consultant to perform all work associated with <br />tree evaluation, inventory, report writing and management. <br />e) The Director's Representative may evaluate each of the Contractor's staff and if <br />he /she finds that a Contractors employee or sub - contractor's employee is not performing <br />to the satisfaction of the Director's Representative, the Director's Representative shall <br />require the Contractor to remove the employee from work sites at his or her discretion <br />within 24 hours of written notice. <br />3. Materials <br />The Director's Representative shall approve or reject all materials delivered to the work site. In <br />addition, the Contractor shall not apply any materials until the Director's Representative inspects <br />the materials to confirm they are correct per specifications. Note that the Director's <br />Representative may stay at the work site to confirm that all materials are applied correctly and in <br />the quantities specified. Materials applied by the Contractor prior to the Director's <br />Representative inspecting the materials shall be considered not applied. Therefore, the <br />Contractor shall not be given credit towards the quantity of the specified material required to be <br />applied by the specification. The Contractor shall then be required to deliver the specified <br />quantity of material to the work site and, following the Director's Representatives approval, <br />apply the materials in the presence of the Director's Representative: <br />a) Prior to the application or use of any materials the Contractor shall submit to the <br />Director's Representative a minimum 48 hours before delivery to the work site a list of all <br />materials and /or chemicals that may be used pursuant to the terms of this Agreement. <br />The list shall include the name of the product, the products specifications, and the <br />quantity of materials, prescribed method of use /application, Material Safety Data Sheets <br />and chemical analysis where applicable, recommended usage and any other <br />manufacturer's data that may be pertinent. The list must be submitted before any <br />materials /chemicals are used pursuant to this Agreement. <br />b) The materials and chemicals utilized in furtherance of this Agreement shall comply <br />with the following standards: <br />(1) All fertilizers shall be complete, furnishing the required percentage of <br />nitrogen, phosphoric acid and potash to keep turf, trees, shrubs and other plants <br />in a healthy and vigorous growing condition. <br />(2) Pesticides including but not limited to: Insecticides, fungicides, herbicides, <br />algaecides, aviacides, and rodenticides shall be of the best quality obtainable <br />and available on the market, properly labeled with guaranteed analysis, and <br />brought to the job site in the manufacturer's original container. <br />(3) Materials shall as specified herein, matching those existing at the work <br />site, or as specified by the Director's Representative. <br />c) All materials delivered to the site shall be accompanied by a packing slip or other <br />form from the vendor indicating the specific commodity delivered and the quantity. <br />Page 9 <br />