Laserfiche WebLink
request from the Director's Representative a new flag. Contractor shall raise the new <br />flag immediately upon receipt from the Director's Representative. <br />d) Drinking fountains shall be cleaned, sanitized and unplugged on a continuous basis. <br />The Contractor shall use approved germicidal cleaner and products to assure that <br />drinking fountains are clean and polished. The Contractor shall remove all mineral build <br />up, algae, stains, etc. using any method deemed expedient. The Contractor shall <br />achieve this level of quality using a combination of cleansers, pressure washer, metal <br />polish product, hand and /or power tools. Should the drinking fountain be so plugged that <br />dismantling the fountain is required the Contractor shall notify the Director immediately <br />so City staff can make the repair. <br />9. Playground/Tot -Lot Areas <br />a) Daily Maintenance - The playground /tot -lots /equipment shall be blown free of debris, <br />sand /wood chips on play equipment, rubberized fall areas and surrounding concrete <br />areas daily. Any sand /wood chips that accumulate on the rubberized surface shall be <br />reused. Sand /wood chips and debris on the playground equipment shall be removed. <br />b) Weekly Maintenance - The Contractor shall loosen compacted sand /wood chip <br />areas, re -grade sand /wood chips areas to level condition (eliminating ruts, depressions, <br />build up areas, etc.), sifting of sand /wood chips to assure that debris and any other <br />foreign objects are removed, removal of weeds, and remove exposed filter fiber and <br />dispose of. <br />c) Annual Turf Berm Renovation - The Contractor shall eliminate berms (including pre- <br />existing) in the turf surrounding or in the vicinity of playground /tot -lots by sod <br />cutting /removing existing turf berms a minimum of three rows wide of sod, leveling to the <br />appropriate grade, re- sodding with thick cut Greg Norman 1 Hybrid Bermuda sod and <br />rolling the sod with a 1.5 ton asphalt roller used for sod compaction. <br />e) The City shall be responsible for all playground equipment and tot -lot area safety <br />inspections. <br />10. Ball Diamond Maintenance <br />The Contractor shall establish a Sport Turf Management crew to specifically perform specified <br />sport field /turf maintenance. <br />The Contractor shall retain a City approved sub - contractor to provide ball diamond infield and <br />warning track maintenance as set forth in Attachment 1. The Contractor shall also establish a <br />Sport Turf Management crew to specifically perform specified sport field /turf maintenance. <br />a) Daily Baseball Perimeter Maintenance <br />Ball diamond perimeter maintenance shall be performed daily. Ball diamond perimeter <br />maintenance shall be defined as all areas outside the field of play and sideline /dugout <br />areas where coaches, players and others associated with the game gather. Ball <br />diamond perimeter maintenance areas shall include but is not limited to grandstands, <br />areas around concession stands, fence lines, warm -up areas, etc. The work that shall be <br />performed on a daily basis shall include picking up trash and debris, blowing off areas to <br />remove brick dust, washing off stains and /or all other foreign material. In addition, <br />removal of such as sunflower seeds or peanut shells, so that all areas, including <br />bleachers, backstops, pavement and landscape areas, are 100% free and clean. All <br />debris mentioned above shall be collected and dispose of. Blowing debris into turf or <br />Page 23 <br />