My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARIPOSA LANDSCAPES, INC. (PARK MAINT.) - 2015 3RD AMEND
Clerk
>
Contracts / Agreements
>
M
>
MARIPOSA LANDSCAPES, INC. (PARK MAINT.) - 2015 3RD AMEND
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2020 10:03:45 AM
Creation date
5/12/2015 1:42:51 PM
Metadata
Fields
Template:
Contracts
Company Name
MARIPOSA LANDSCAPE
Contract #
A-2015-028
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
2/17/2015
Expiration Date
1/31/2016
Insurance Exp Date
4/1/2015
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.0 Work to be Completed "BI- MONTHLY" <br />9.1 To maintain levelness of all fields, contractor shall, once every two months, scarify drag built up <br />amounts of materials at high spots and cut and level drag the scarified material to low spots. <br />The Contractor shall fill any remaining low spots with new Stabilizer Solutions Stabilizer Gold <br />Infield Mix (with stabilizer) brickdust from stock and make level. Cap with calcified clay Turface. <br />Note: Staff shall identify areas to scarify /cut and level drag to the contractor at weekly <br />meetings with contractors appointed site supervisor (as per section 6.2 of contract). <br />9.2 Heavy water scarified and cut and leveled areas to a '/3" min. depth and allow settling in before <br />play on field. <br />Note: Due to heavy watering and its need to settle before play, staff shall provide a schedule of <br />bi- monthly scarify /cut and level drag dates to contractor. <br />10.0 Work to be Completed "ANNUALLY" <br />10.1 Each year, the following renovation is to be done on all fields in conjunction with the City's <br />Annual Sports Turf Renovation Schedule. Fields renovated may change from year to year. <br />10.1.1 Contractor shall laser grade each ball diamond. Contractor shall scarify drag built up <br />amounts of materials at high spots and cut and level drag the scarified material to low <br />spots. The Contractor shall fill any remaining low spots with new Stabilizer Solutions <br />Stabilizer Gold Infield Mix (with stabilizer) brickdust from stock and make level. <br />Note: Staff shall identify areas to scarify /cut and level drag at the November meeting with <br />contractor's owner (as per section 6.3 of contract). <br />10.1.2 Contractor shall verify and maintain all base distances, pitching rubber distances and <br />pitching mound specifications per the Little League, Pony /Colt League specifications for <br />each specific field. Contractor shall repair any specifications not being met on any field. <br />In addition, the Director's Representative may elect to pay extra for the Contractor to <br />install 1/2" new Stabilizer Solutions Stabilizer Gold Infield Mix (with stabilizer) to in- fields <br />at all diamonds (minimum 25 tons per Girls Softball /Major Little League Field and <br />minimum 50 tons per Junior /Senior Little League Field). Also, the Director's <br />Representative may elect to pay extra for the Contractor to install a minimum of 2 ton of <br />Turface calcite clay per Girls Softball /Major Little League Field and 4 tons of Turface <br />calcite clay to Junior /Senior Little League Fields Responsibility for and purchase of <br />necessary materials shall be at contractor's expense. <br />10.1.3 The Director's Representative may elect to pay extra for the Contractor to rebuild <br />pitcher's mound and batters boxes to MLB specifications for high school /college /senior- <br />junior diamonds and Little League specifications for Little League major diamonds using <br />Hill Topper Mound Mix capped with calcified clay by Turface. <br />11.0 Work To Be Completed "AS DIRECTED" <br />11.1 Replace Base ANCHORS as directed. <br />Note: City of Santa Ana uses the Hollywood Breakaway base anchoring system. Contractor shall <br />install base anchors into the ground per manufacturer's standards. Top of stake shall be <br />approximately 2" below the surface grade so that the base sits level and flush against the <br />surface on all sides. <br />Page 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.