Laserfiche WebLink
12.4.1 Any grasses other than the original hybrid Bermuda, and cropped over perennial rye <br />installed in the infield shall be eradicated immediately upon notice. The Contractor may <br />choose the method of eradication, however, may not damage the turf. <br />12.4.2 Any broadleaf and /or turf type weeds shall be eradicated immediately upon notice. The <br />Contractor may choose the method of eradication, however, may not damage the turf. <br />12.5 Infield turf shall be kept free of disease and rodents at all times. <br />12.5.1 The Contractor shall be responsible for identifying and treating any diseases or rodents <br />immediately upon notice. <br />12.6 Infield turf annual renovation (Optional, at City's request, as a contingency item) <br />12.6.1 Each year the infield turf shall be renovated: 1) verticut using the straight blade reels <br />with blades 1.26- 1.50" apart; 2) mowed to 1/4" high immediately following verticutting; 3) <br />overseeded with Stovers Seed Company Bermuda Dunes at a rate of 8 pounds of seed <br />per 1,000 square feet; and, 4) top dressed immediately following seeding by Materials <br />using "Santa Ana Top Dress Mix" 114" minus STA tested /approved compost -seed topper <br />with California Organic Phyta -Boost 7 -1 -2 fertilizer pre -mixed (35 cubic yards seed <br />topper to 700 pounds of organic fertilizer). <br />12.7 Infield monthly overseeding (Optional, at City's request, as a contingency item) <br />12.7.1 Each month the infield turf shall be verticut using the greens reel mower straight blade <br />reels with blades 1.26- 1.50" apart and overseeded with Stovers Seed Company <br />Bermuda Dunes at a rate of 1 pound of seed per 1,000 square feet or Simplot's Jacklin <br />Seed Company CSI Perennial Rye at a rate of 1 pound of seed per 1,000 square feet. <br />13.0 General Contract Provisions <br />13.1 Contractor shall provide and is responsible for all equipment necessary to carry out the work <br />outlined in the contract. There will be no available storage for equipment. Contractor will be <br />responsible for bringing in and then removing all equipment necessary to carry out the work <br />outlined in the contract. <br />Page 37 <br />