Laserfiche WebLink
Section 5: Total Proposed Project Cost by Task <br />Primary Implementation <br />The Primary Implementation will include the following elements. <br />Table 2. Estimated Cost of Proposed Signal Improvements for Harbor Boulevard by Agency <br />Total <br />Match <br />Cash <br />In -Kind <br />a. Project Administration <br />$86,000 <br />$1,200 <br />$16,000 <br />b. Developing and Implementing Optimized Signal Synchronization Timing <br />$178,000 <br />$15,200 <br />$20,400 <br />c. Producing a Before and After Study for the proposed project <br />$46,000 <br />$9,200 <br />$0 <br />Total 1 - Project Admin, Developing/Implement Timing, Final Report, and Engineering Design <br />$310,000 <br />$25,600 <br />$36,400 <br />e. Proposed Signal System Improvements <br />Description of <br />Unit <br />Material, <br />Match <br />Cash <br />In -Kind <br />Agency <br />Harbor @ <br />Work at This <br />Price * <br />Unit <br />Design <br />Tax, & <br />Total <br />Location <br />Lo <br />Labor <br />Video Detection <br />Garden Grove <br />Chapman Ave <br />Upgrade, EVP, Ped <br />$29,500 <br />1 <br />$1,000 <br />$29,500 <br />$30,500 <br />$6,100 <br />$0 <br />Upgrade <br />Resort <br />Video Detection <br />Garden Grove <br />Way /Target <br />Upgrade, EVP, Ped <br />$29,000 <br />1 <br />$1,000 <br />$29,000 <br />$30,000 <br />$6,000 <br />$0 <br />Ctr <br />Upgrade <br />Garden Grove <br />Twintree Ave <br />Video Detection <br />Garden Grove <br />Lampson Ave <br />Upgrade, EVP, Ped <br />$33,700 <br />1 <br />$1,000 <br />$33,700 <br />$34,700 <br />$6,940 <br />$0 <br />Upgrade <br />Garden Grove <br />Water Park <br />Video Detection <br />Garden Grove <br />Palm St <br />Upgrade, EVP, Ped <br />$29,000 <br />1 <br />$1,000 <br />$29,000 <br />$30,000 <br />$6,000 <br />$0 <br />Upgrade <br />Garden Grove <br />Video Detection <br />Garden Grove <br />Blvd <br />Upgrade, EVP, Ped <br />$33,700 <br />1 <br />$1,000 <br />$33,700 <br />$34,700 <br />$6,940 <br />$0 <br />Upgrade <br />Video Detection <br />Garden Grove <br />Harbor PI <br />Upgrade, EVP, Ped <br />$32,000 <br />1 <br />$1,000 <br />$32,000 <br />$33,000 <br />$6,600 <br />$0 <br />Upgrade <br />Caltrans <br />SR -22 WB Off <br />Ramp <br />Video Detection <br />Garden Grove <br />Trask Ave <br />Upgrade, EVP, Ped <br />$29,000 <br />1 <br />$1,000 <br />$29,000 <br />$30,000 <br />$6,000 <br />$0 <br />Upgrade <br />Video Detection <br />Garden Grove <br />Cardinal St <br />Upgrade, EVP, Ped <br />$46,400 <br />1 <br />$1,000 <br />$46,400 <br />$47,400 <br />$9,480 <br />$0 <br />Upgrade, Cabinet <br />Upgrade <br />System Detection, <br />Garden Grove/ <br />Westminster <br />CCTV Camera <br />$20,000 <br />1 <br />$2,000 <br />$20,000 <br />$22,000 <br />2400 <br />$2,000 <br />Santa Ana <br />Ave <br />System, Bluetootl <br />Travel Time <br />Install Fiber in <br />Existing Conduit, <br />System Detection, <br />Santa Ana <br />Hazard Ave <br />Ethernet <br />$14,200 <br />t <br />$3,000 <br />$14,200 <br />$17,200 <br />$440 <br />$3,000 <br />Communication, <br />Bluetooth Travel <br />Time, Ped Upgrade <br />0 <br />