Laserfiche WebLink
10 <br />Install Conduit & <br />Fiber, Ethernet <br />Costa Mesa <br />Law Court <br />Communication, <br />$41,500 <br />1 <br />$1,700 <br />$41,500 <br />$43,200 <br />$8,640 <br />$0 <br />Cabinet Upgrade, <br />Battery Backup, <br />EVP <br />Install Conduit & <br />Costa Mesa <br />South Coast Dr <br />Fiber, CCTV <br />$24,800 <br />1 <br />$1,100 <br />$24,800 <br />$25,900 <br />$5,180 <br />$0 <br />Camera System, <br />EVP, Ped Upgrade <br />Caltrans <br />1 -405 NB Off <br />Controller Upgrade, <br />Ramp <br />CPS Unit <br />Caltrans <br />1 -405 SB Off <br />Controller Upgrade <br />Ram <br />Install Conduit & <br />Costa Mesa <br />Gisler Ave <br />Fiber, CCTV <br />$23,600 <br />1 <br />$1,000 <br />$23,600 <br />$24,600 <br />$4,920 <br />$0 <br />Camera System, <br />EVP, Ped Upgrade <br />Costa Mesa <br />Date PI <br />CCTSystem, V Came ra <br />$16,500 <br />1 <br />$700 <br />$16,500 <br />$17,200 <br />$3,440 <br />$0 <br />EVP <br />Install Conduit & <br />Costa Mesa <br />Nutmeg PI <br />Fiber, EVP, Ped <br />$11,600 <br />1 <br />$500 <br />$11,600 <br />$12,100 <br />$2,420 <br />$0 <br />Upgrade <br />Install Conduit & <br />Fiber, CCTV <br />Costa Mesa <br />Baler St <br />Camera System, <br />$61,300 <br />1 <br />$2,500 <br />$61,300 <br />$63,800 <br />$12,760 <br />$0 <br />Cabinet Upgrade, <br />Battery Backup, <br />EVP, Pod Upgrade <br />Costa Mesa <br />Adams Ave <br />Install Conduit & <br />$8,000 <br />I <br />$400 <br />$8,000 <br />$8,400 <br />$1,680 <br />$0 <br />Fiber, EVP <br />Mesa <br />Costa Mesa <br />Verde /Peterson <br />EVP, Ped Upgrade <br />$9,300 <br />1 <br />$400 <br />$9,300 <br />$9,700 <br />$1,940 <br />$0 <br />PI <br />Cabinet Upgrade, <br />Costa Mesa <br />Merimac Wy <br />Battery Backup, <br />$45,800 <br />1 <br />$1,900 <br />$45,800 <br />$47,700 <br />$9,540 <br />$0 <br />EVP, Ped Upgrade <br />Install Conduit & <br />Fiber, CCTV <br />Costa Mesa <br />Fair Dr <br />Camera System, <br />$60,100 <br />1 <br />$2,500 <br />$60,100 <br />$62,600 <br />$12,520 <br />$0 <br />Cabinet Upgrade, <br />Battery Backup, <br />EVP, Pod Upgrade <br />Costa Mesa <br />Harbor Ctr <br />EVP, Ped Upgrade <br />$8,100 <br />1 <br />1 $400 <br />$8,100 <br />1 $8,500 <br />$1,700 <br />$0 <br />CCTV Camera <br />Costa Mesa <br />Wilson St <br />System, Cabinet <br />$41,300 <br />1 <br />$1,700 <br />$41,300 <br />$43,000 <br />$8,600 <br />$0 <br />Upgrade, EVP, Ped <br />Upgrade <br />CCTV Camera <br />Costa Mesa <br />Victoria St <br />System, Cabinet <br />$41,300 <br />1 <br />$1,700 <br />$41,300 <br />$43,000 <br />$8,600 <br />$0 <br />Upgrade, EVP, Ped <br />Upgrade <br />Install Conduit & <br />Costa Mesa <br />Hamilton St <br />Fiber, Ethernet <br />$48,300 <br />1 <br />$2,000 <br />$48,300 <br />$50,300 <br />$10,060 <br />$0 <br />Communication, <br />EVP, Ped Upgrade <br />Install Conduit & <br />Fiber, CCTV <br />Costa Mesa <br />Bay St <br />Camera System, <br />$87,600 <br />1 <br />$3,600 <br />$87,600 <br />$91,200 <br />$18,240 <br />$0 <br />Ethernet <br />Communication, <br />EVP, Ped Upgrade <br />10 <br />