My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - RFP AFFORDABLE HOUSING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
05/19/2015
>
19E - RFP AFFORDABLE HOUSING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2015 4:55:08 PM
Creation date
5/14/2015 2:43:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
19E
Date
5/19/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Fencing, walls and gates hazard -free and intact. All gates shall be in good <br />working order. <br />• The site shall be free from trash, debris and hazardous materials. <br />• Accessory buildings shall be safe and sound. <br />Paving • All new paving and walkways shall be constructed with concrete (2,000 <br />PSI @ 28 days). <br />• Driveways shall be reinforced with wire mesh. Sawn expansion- contraction <br />joints shall be placed every 8 feet in both irections. <br />• All paving and walkways shall be fi with a light broom texture. <br />• All walkways shall be at least ide. Sawn expansion- contraction joints <br />shall be placed every 4 feet. <br />Landscaping & Irrigation • To the extent possible an a w landscaping shall be drought <br />resistant. <br />• When a lawn i<sys7hall he ne area shall be reduced to aid in <br />the reduction of w <br />• New irrigation e weather o or based and EPA Water - <br />Sense qualified. <br />_ • All new irrigati ned to conse ter. <br />Fences, Walls & Gates • A ll ood fences sh rom good quality m Is. They <br />shall b supported wi pressure treated posts (8 feet O.C.) and 2X4 <br />rails (top The posts a embedded in a concrete footing at least <br />18" deep. <br />• All new walls construc th 6X8X16 concrete block. They <br />II be prope pporte tinuou ing and reinforced with steel <br />Roof Coverings • 25 -year, 3 -tab, self - sealing composition shingle. Built -up membrane (hot mop) <br />system on all flat roofs. <br />• Lighter colored coverings are preferred for energv efficiencv. <br />Minimum Standard • Safe, structurally sound and watertight. <br />Rehabilitation . Decks, balconies and railing that do not meet the minimum standard shall <br />be replaced. Practical, cost effective repairs are acceptable as long as compliance <br />City of Santa Ana Community Development Agency <br />Request for Proposals for Affordable Housing Development <br />1 k315 <br />
The URL can be used to link to this page
Your browser does not support the video tag.