My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - CATCH BASIN PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
05/19/2015
>
25C - AGMT - CATCH BASIN PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2015 5:02:52 PM
Creation date
5/14/2015 4:34:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
5/19/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cauaty oforla, ochbifu WgFkB ibfA- d$d «ISR72d98 <br />Unked,Aderm Water Cam <br />All Insurance poliaios required by this contract shall give the County of Orange 30 days notice in the <br />event o£eanealladon and 10 days for non paymmrt of premium. This shall be evidenced by policy <br />provisions crap ondomement separatarMm dre C'orligoate oflnsmm�ne. <br />If, Comractneg Professional Liability policy is a "Mains made" policy, Contraoor shall agree to <br />malatnln professional liability rrovaragofor two yours ihllawing camplotiou of contract. <br />The Commercial general Liability policy shall nonmin a &everability of intone is Alamo also known <br />as a "separation otinourods" clause (standard in the ISO CU 0001 policy). <br />Insurance aottifivates should be forwarded for <br />County of Orange, OC public Walks <br />procurement Services <br />300 N. plower, Suite 838 <br />Santa Ann, CA 92703 <br />if the Contractor falls to provide dra nsuraneo oortifitedes and endorsamonts within saran days or <br />notification by OC Pubfia Works procurement Division, award may be made to the next qualified <br />vendor. <br />County expressly retains thatight to require Contractor w increase or docreaso insurance of any of om <br />above insurance types throughout the lam of this Contract Any incraso or decrease In immune <br />will be as deemed by CountyofOxangoRisk Manager as appropriate W adequately protect County. <br />County shall notify Contractor in wridng of changes in the insurance requirements. If Contractor <br />does not doiresit copies of acceptable eerdfiowas of insurance and endorsements with County <br />incorporating such rhongos within thirty days of reaelpt of such notice„ rids Cnnna u may be inbowe <br />without further notion to Contractor, and County shall be entitled to Ali legal remedies. <br />The procuring of such required pnl3cy or policies of lasumuce shall not be oanstsued to flush <br />C•onunowes liability hereunder nor to fulfill the indemnification provisions and rogufxomoata of U <br />Contract nor act in any way to reduce the policy coverage sad limits available stem the lnanme. <br />29, 11111.9 and Llano: Contractor shall pay promptly all indebtedness for labor, materials and equipment <br />used ih per£ormarwre of the work. Contmotorsball not parmit any Gen or charge fo outset to the work <br />or the premises, but if any does so attach, Contractor shall promptly income its retanne and, In <br />oceardmrce with the mqufremanta of Article 40' below, indemoff7, defend, and hold. County <br />barealoss and be mspanaible fir payment of all wale, damagon, penalties and expenses related to or <br />arlaing from orrolated thetem. <br />X Changes: Contractor shall make no changes in the work or perform any Additional work widmutthe <br />Comity'& opccific written approval, <br />31, Change of Ownexshlps Contractor agrees that if them Is a change or transfer in ownership of <br />Contractor's business prior to completion of this Contract, the new owners shall be required umlor <br />tetras of solo or other ttanstr to assume Contractor's duties and obligadans committed In this Contract <br />and complete them to the eaddfaotban of County,. <br />N. Votes Majeure: Contractor shall not to assessed with liquidated damages or unsatisfactory <br />performance penalties during any delay beyond the time named for the performance of this Creme <br />P48019 page <br />d af20 <br />14 <br />25C -18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.