My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - CATCH BASIN PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
05/19/2015
>
25C - AGMT - CATCH BASIN PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2015 5:02:52 PM
Creation date
5/14/2015 4:34:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
5/19/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Count,gfOreage, 00 Public Wmkr AfA480.1$0Il;98 <br />Unlaad&arm Water, lna <br />ATPAcHasENTA <br />SLOP$ OP WORK <br />BACKOROdNn <br />Tho Orange Comity Transportation Authority's (OCTA) Environmental Cleanup Program (ECP) provides <br />area porcant allocation of annual grass Maasam M2 (M2) ,avenues to Improve owmll wstar quality in <br />Crauge, County from tramponation-eatated pollution. The ECP competitive funds can be end to <br />Implmmeat water qualify Improvement projects addressing pollutants originating from or conveyed <br />through transportation systems. Those tlmda will assist Orange County cities and the County of orange <br />In meoting federal Clean Water Act standards for urban mnofPthrough the in roluue and installation of <br />maognived shuctuml beat management prsedxs (BMPa), Third parties such as public water and <br />wastewater agencies, environmental advocacy argaalzatlem, and Iwm 0amM associations may also <br />seminars projects through a municipality that is willing and able to tako responsibility for marrying out <br />slid maintaining the project. <br />The ECP's Tier I Grant Program fonds the purchase and installation of most to medium scale BMPs that <br />capture and/or treatpollwantn. Water qual ity projects, mganflcss of the type o£mclumlogy implemented, <br />ate eligible for Tier 1 funding provided they have a verifiable benefit to water quality end fall within the <br />maximum per project programming cap, The Tier I Grant Program Is designed to supplement, not <br />supplant existing hangponation related water quality programs. Funds will be awarded to the most oast. <br />effective projects that improve water quality. The complete Tier I grading guidelines can be viewed <br />online at hltg;% /wgyl acts naf>tU[e@gptgyyj Nrcag lg tr-rhmlitvlOvervi t. <br />A total of up to S193 million is available for the Tian 1 program over a mven-yaw window of gecal your <br />2011.12 through, fiscal year 2017 -18 with appmximardy $2.8 million available for each ref. Three tags <br />for projects have been field W date for Tier 1. OCTA will mamma the rah for project$ cycle and funds <br />available following the completion of fiscal year 2017.18. <br />Ile DESCRIPTIONOF PROJECT <br />In conned with, the M2 ()rant Program, this Scope of Work is designed to emeralds a panel of Contractors <br />to achieve economies of scale on a list of fixed unit prices for the purchase and installation ufequipment <br />and devices designed to remove fitter, debris, and other water quality pollutants, krolo raft"d to as <br />"Stonnwater Treatment Devices." Selected Contractors will be part of a Motor Agreement between the <br />County of Orange and OCTA that will allow municipalities to select focal a feting of Contractors to <br />provide, supply, fabricate, construct, deliver, and instal Shomwater Treatment Revises. Agencies <br />wishing to use the Master Agreement may purchase BMN with M2 grant monies or any other grading <br />source, <br />Accordingly, the goal of this RFP is to establish a Master Agreement that achieves strategic savings that <br />would benefit the County and OCTA to act 03 the purchasing and contract administrators for M2 grant. <br />allgible ontitim. Proposals that do not provide a discounted price that offer economlov grsoale fart are <br />more than standard hulk pricinglinstallation, dtsllog will nor be considered. Proposals will not be <br />accepted solely 'far equipment purchases or installations. Awarded BCP entitles are not obligated to <br />utilize the selected Connecters. Rather, this process Is Intended to provide amachenism Introduced rafts <br />for equipment mid Its Installation far Orange County municipalities, Including those, implutnenting <br />projects with M2 funding. to addition, if a local agency is a party to this Maker Agreement, a separate <br />agreement, city entmef resolution, nr other protocol may be naomeary with the selected Contractor(e). <br />The eligible qualifications am discussed below, <br />P08019 Page <br />13 oJ20 <br />19 <br />25C -23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.