My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - CATCH BASIN PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
05/19/2015
>
25C - AGMT - CATCH BASIN PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2015 5:02:52 PM
Creation date
5/14/2015 4:34:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
5/19/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cowgp gronosge, OOPubtle {Narks MJ4- ps0- T.SOIXIpB <br />United Storm Macon Jar.. <br />• Overflow or bypass flow capacity edits equipment when fits of trash and overnowlag (ie., <br />storage capacity of the equipment whoa the ono-year, one hour storm is no longue fully <br />Missed) (if applicable). <br />Maximum overflow or bypass now capardty of tho device (Lo., 10y4ar storm event) (i£ <br />applicable), <br />< Device performaaca anbutivanass in tons of pounds of trash removed per total prefect cast <br />(sec seetumv„ pJ <br />C. $lung, Operation, and Maintenance <br />Description of Coatmttor'x installation process Including co rialmmin and review, of device <br />locations with munleipal start, fmftio control during installation, and estimated time required <br />to fnshtll eaclr device. <br />Dasoripllon of the site-apsoiile raaatimementa good other information a municipality must <br />provide the Coubwaor for determiiring ilia appropriate size and configuration of the davits <br />for that lacadmi (,.a. Nigible ondilas will need to determine how to select the right device for <br />their dashed lactates). <br />A discussion of my regulatory pamita that may be required for installation. <br />Maintenance requlr m onto (desocibo In detoll how the device must be maintained end the <br />appric lmala umoing of time required for cleaning cr malaranance.. In addition, discuss <br />whether the device has design capabilities for easy removal for cleaning ormainienaace). <br />- Rialmawd life cycle costs for militiaman, <br />• <br />Durability against external factors, such as straet swceping, car parking, do. <br />• Availability ofreplacamvntpart% and life etpuateooy, <br />Worrmuy coverage and duration <br />Aesthetics and raft. <br />- Any key lactots that makes tine deviva unique among other products. <br />Coutractor's Installation ltnekgroand <br />Ability of Contractor to have staff and/or cuhconuacter(a) to manufacture device and provide <br />I <br />nstallation to eligible endties within Orange County.. <br />- L6eparienca, background, training, mid number of staff and/or suboonitwtor(e) who will f1swcato <br />and/or install device. <br />19. Oparaling Loaauons, B¢fersncsx, and Certifications <br />- A mhtimum of three locations, inclusive of address or rwarest intorseaticn, and pintos of <br />device in operation within southern Califomio, preferably Orange county. <br />Continuations ubbdned from public agcuoies and /or Itogto ial Water Quality Control. Boards. <br />POMP Page <br />X6gf.V <br />22 <br />25C -26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.