Laserfiche WebLink
include 15% conduit repair in the proposal. Costs for conduit repair including materials and labor will <br />be included in the lump sum costs proposed. The Proposer may need to excavate to access and <br />disconnect the existing conduit sweeps at the pole foundations to properly pull the new wire. All costs <br />for excavation, including hardscape replacement and conduit disconnect /reconnect shall be included <br />in the lump sum price. <br />Scope of work includes the following: <br />Install new service pedestals per specifications. <br />Remove existing cable from conduit. <br />Intercept existing conduit and install new conduit and pull boxes to connect to new service <br />points. <br />• Re -wire system using existing conduit. <br />• Replace any deteriorated conduit only if it is impossible to pull the new wire through. <br />• Remove and salvage existing fixtures. <br />• Rewire poles and install new fuses and fixtures, etc. per City Standard #1126 -F. <br />Material List: <br />Fixtures: Powerlux PLEDMR /DV/B19/4000/740/120.277/SA <br />Wire: THW red, black, green <br />Conduit: 2" Schedule 80 PVC <br />Fuses: 240V 10A with holder per City Standard #1126 -F two (2) per pole <br />• Service Pedestals: Milbank MILCP3B1 11 15A22SP33 120/240V w/ GFI duplex receptacles; <br />base MILCP16PDMNTCALT <br />PART II SPECIAL PROVISIONS <br />I. EXCAVATING AND BACKFILLING <br />Excavating and backfilling shall conform to Section 86.2.01, "Excavating and Backfilling" of the <br />California State Specifications (CSS) and these Special Provisions. <br />The following paragraph shall be added to Section 86 -2.01: <br />All excavated material in roadway shall be removed from the site and backfilled with compacted <br />crushed aggregate base material topped with temporary asphalt concrete on the same working day <br />as removed. A temporary alternative to backfilling, with permission of the Agency, shall be the <br />placement of steel plates with temporary asphalt concrete ramping at edges of the steel plates. Such <br />plating shall not be allowed for more than five (5) working days, after which backfill shall be required. <br />Slurry backfill: Use of a half -sack cement and sand slurry provided by a commercial ready -mix <br />concrete vendor may be permitted except in parkway areas. The slurry shall be placed monolithic <br />from the bottom of the excavation to the bottom of the existing structural section or sidewalk; or as <br />directed by the Agency. <br />25D -94 <br />