Laserfiche WebLink
EXHIBIT B - SCOPE OF WORK <br />Centennial Education Center (CEC) Parking Lot Restoration and Restripe <br />Location: Area of work is located at Rancho Santiago Community College District's <br />Centennial Education Center at 2900 W. Edinger Ave. Santa Ana, Ca. 92704. <br />1. Restoration and restriping of the parking lot areas to the North and East of the CEC Buildings. <br />Refer to Exhibit B for details. <br />2. Proj ect duration is 44 calendar days from April 3 — May 17, 2015. The work is to be completed <br />in 3 Phases. Phase 1 - April 3-12,2015 for the asphalt removal, replacement and overlay. Phase <br />2 — Asphalt cure time. There will be no work activities during Ph 2. Phase 3 — May 16 — 17, <br />2015 for the application of the slurry seal and parking lot striping. In the event of scheduling <br />conflicts or inclement weather during April 3 -12, 2015 which does not allow for the removal, <br />replacement and overlay work to be completed, the work will be re- scheduled to take place <br />between June 8 and July 19, 2015. District to bare no increase in project cost due to re- <br />scheduling of the work from April to June. <br />3. Parking Lots #1 (Alt 1) and #2 are to have the damaged AC removed and replaced with new 4" <br />asphalt . A new 1.5" asphalt overlay is to be applied to the entire asphalt surface of Parking <br />Lots #I (Alt 1) and #2. New parking stall striping and red Fire lane stencil and red curb to meet <br />Fire Department requirements. The required AC repairs, slurry and striping work for Parking <br />Lot #1 is to be included in Additive Alternate #1. <br />a. Saw -Cut and Remove existing damaged asphalt to a total depth of (4) inches and haul away <br />spoils to a legal dumpsite. Refer to Exhibit C for limits and locations of asphalt removals and <br />replacements. <br />b. Compact soil at removal locations to 95% prior to placement of (4) inches of new hot asphalt. <br />Roll and Compact. <br />c. Clean existing asphalt surface and mill (grind) along edges to a total depth of (1.5) inches and <br />haul away spoils. Provide smooth transitions from new paving to existing surfaces. <br />d. Install leveling course with hot asphalt as needed. <br />e. Clean and crack fill existing asphalt surface of Parking Lots #1 (Alt 1) and #2, apply tack coat <br />and Machine overlay entire asphalt area with (1.5) inches of hot asphalt, roll and compact. <br />f Raise manholes and water valves up to new grade elevation set in concrete. <br />g. Edges tapered to meet existing to maintain water drainage as best as possible <br />h. Apply 2 coats of slurry seat after new asphalt overlay has cured 30 days. Slurry seal coats are <br />to be installed on the first Saturday and Sunday after the 30 day cure time of the new asphalt. <br />All premium wage rates for weekend work are to be included in the base bid amount. <br />.o <br />