Laserfiche WebLink
dimensions of 1.75" square and a minimum thickness of 14ga. Picket holes in the ForeRunnerT1 <br />rail shall be spaced 4.98" o.c. Picket retaining rods shall be 0.125" diameter galvanized steel. <br />Posts shall be a minimum of 2-1/2" square x 12ga. High quality PVC grommets shall be <br />supplied to seal all picket -to -rail intersections, <br />Fabrication <br />A. Pickets, rails, and posts shall be precut to specified lengths. ForeRunnerW rails shall be pre - <br />punched to accept pickets. <br />B. Grommets shall be inserted Into the pre -punched holes in the rails and pickets shall be inserted <br />through the grommets so that pre -drilled picket holes align with the internal upper raceway of <br />the ForeRunnerT"" rails; (Note: This can best be accomplished by using an alignment template,) <br />Retaining rods shall be Inserted into each ForeRunnerTM rail so that they pass through the <br />predrilled holes in each picket, thus completing the panel assembly. <br />C. Completed panels shall be capable of supporting a 600 lb, load (applied at midspan) without <br />permanent deformation. Panels without rings shall be biasable to a 25% change in grade; <br />panels with rings shall be:biasable to a 12,5% change in grade. <br />D. Gates shall be fabricated using Aegis II'm panel material and gate ends having the same <br />outsidecross-section dimensions as the ForeRunnerTm rail. Ali rail and upright intersections <br />shall be joined by welding. All picket and rail intersections shall also be joined either by welding <br />or by the same retaining rod process used for panel assembly. <br />Part;3 - Execution <br />Preparation; All new installation shall be laid out by the contractor in accordance with the construction <br />plans. <br />Installation: Fence posts shall baset 'in accordance with the spacing shown In Table 2; plus or minus <br />1/2", depending on the nominal span specified. <br />Table 2 — Post Spacing Requirements <br />Gate posts shall be spaced according to the gate openings specified in the construction plans, <br />Concrete Footings for steel posts shall be per manufacturer's recommendations and details as shown. <br />Cleanin : The contractor shall clean the jobsite of excess materials.. <br />Payment for Ornamental Steel Fencing shall be paid at the contract unit prices listed in the Bid Proposal <br />for Ornamental Steel Fencing and shall include all equipment, post hole excavations, concrete footings <br />and other incidentals as necessary to install complete and in place for the project as shown on the <br />drawings and specified herein <br />City of Santa Ana RFP 13-064 <br />Page 21 <br />