My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - PLAN CHECK SRVS FOR ONE BROADWAY PLAZA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
06/02/2015
>
25F - AGMT - PLAN CHECK SRVS FOR ONE BROADWAY PLAZA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2015 4:36:00 PM
Creation date
5/28/2015 3:31:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
25F
Date
6/2/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1� /�r� NAESIH YQUSSEF <br />� ASSOC I RT E S <br />,,// i� <br />STRUCTURAL ENGINEERS <br />Scope of Services: <br />City of Santa Ana Plan Check- 07332.03 <br />Proposal for Structural Engineering Consulting Services <br />May 27, 2015 REV1 <br />Page 2 of 3 <br />Part 1: Review updates to the existing foundation permit for 2013 code level forces from Superstructure. <br />Fee: Time and Material — Not to Exceed $11,300.00 (per attached hourly rates) <br />Part 2: Review Superstructure package for permit under CBC 2013. <br />Fee: Time and Material — Not to Exceed $13,700.00 (per attached hourly rates) <br />Part 3: Additional structural plan review, including revisions and changes to the Foundation & <br />Superstructure permit during construction <br />Fee: Time and Material — Not to Exceed $50,000.00 (per attached hourly rates) <br />Note: The Foundation permit review requires us to review many elements of the superstructure design <br />such as shear walls, and analysis model details. These features will be reviewed in both Part 1 and Part 2. <br />Fees: <br />Our total fee for the above - mentioned structural engineering services will be: <br />TIME & MATERIAL: Not to exceed $ 75,000.00 (see attached hourly rates) plus Customary Reimbursables <br />Customary Reimbursable Expenses will have a 15% mark -up incurred in the performance of the work. <br />I look forward to discussing this important project with you. <br />Sincerely, <br />��C✓�6rGv��a� <br />Nabih Youssef, S.E. <br />Principal <br />Accepted: <br />Building Safety Manager/ Building Official <br />City of Santa Ana <br />,LO Sruih Hopr. S rE rC Suiic 1700 , Los A� gde. (alifo )M 9007:. 1 Fr 213 -362-010'/ • FAX Z i -688-309'y , VWN. NYASFCCM <br />LOS ANGELES 1RVINL a SAN FRANCISCO <br />25F -10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.