Laserfiche WebLink
Sewer <br />Improvements <br />5 — Projects <br />$4,482,600 <br />• Sewer Main <br />Improvements <br />- Columbine <br />- Warner Industrial <br />Park <br />- Parton, Garnsey, <br />Van Ness, 15th <br />Streets <br />Citywide Sewer <br />Main Improvements <br />• Sewer Main Repairs <br />& Replacements <br />or <br />-P <br />1612PUBLIC UTILITY/ <br />DRAINAGE <br />IMPROVEMENTS <br />$32,2193849 <br />Water r Facility Street Light <br />Improvements Improvements Improvement <br />8 - Projects y 5 — Projects 1 — Project <br />$19,421,630 J ' $7,040,000 $85,000 <br />�• Water Main <br />Improvements <br />- Bristol Phase 3B <br />- Warner Industrial <br />Park <br />- S. Bristol <br />• Neighborhood Water <br />Main Projects <br />- Centennial <br />- Riverview <br />- West Grove <br />Valley <br />• Advanced Meter <br />Y Infrastructure <br />• SA -5 MWD Turnout <br />Vault Relocation <br />• Segerstrom (San <br />Lorenzo) Sewer Lift <br />• S. Station <br />Perimeter Wall <br />• Well No. 32 <br />Rehabilitation <br />• Walnut Pump <br />I Station <br />• Perform study <br />and formulate <br />plan to perform a <br />Citywide LED <br />conversion <br />(Ot�w�' <br />Drainage/Water <br />Quality <br />5 — Projects <br />$1,190,619 <br />• Drainage Master <br />Plan Supplement <br />• First St. <br />Undercrossing Lift <br />Station <br />• Residential Catch <br />Basin Connector <br />Pipe Screen <br />Installation <br />• Santa Ana Delhi <br />Channel Diversion <br />• Morrison Park LID <br />0&1 <br />