My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
U.S. DEPARTMENT OF EDUCATION-1991
Clerk
>
Contracts / Agreements
>
U
>
U.S. DEPARTMENT OF EDUCATION-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 3:15:14 PM
Creation date
6/9/2015 2:19:21 PM
Metadata
Fields
Template:
Contracts
Company Name
UNITED STATES OF AMERICA
Contract #
A-1988-009
Agency
Parks, Recreation, & Community Services
Council Approval Date
2/16/1988
Destruction Year
P
Notes
Deed 7435 and Quitclaim Deed 7592 copies in file
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
140;.1(0 <br />ATTACHMENT "E" <br />Page 2 <br />S. Please describe the composition of the sub - surface <br />area. Are there mineral deposits? (Applicable only <br />for all new complexes as well as new facilities in <br />rural and suburban areas). <br />Sandy silt; no minerals known. <br />6. Will the facility obtain water from a natural <br />source, such as wells, rivers, lakes, catchment <br />basins, etc.? <br />Not directly. <br />7. How high will the facility be from ground level? <br />Are there any aircraft approach or departure pat- <br />terns, TV or radio transmission facilities within <br />three horizontal miles of the facility? If so, <br />please describe. <br />Two story with five story tower; no. <br />8. Describe any new air pollution sources that will be <br />introduced as part of the facility (heating, cooling, <br />incineration, etc.) together with the emission rates <br />expected. Provide the percent increase of emissions <br />from the usage of existing sources. Please classify <br />such sources as to short -term (construction) and <br />long -term (operation) and describe methods for mini- <br />mizing such effects if such remedies are known. <br />None. <br />9. Approximately how many vehicles will be introduced <br />into the area on a daily basis as a result of the <br />operation of the facility? What is the approximate <br />percentage increase in daily traffic in the area? <br />Fifty vehicles daily on average; 1000 increase, <br />however, traffic is currently negligible. <br />
The URL can be used to link to this page
Your browser does not support the video tag.